PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1285

Add more system bindings to reference users

Currently, system bindings only include Assigned to and Assigned users. To simplify script configurations and allow for more automated workflows, there is a need to include more. Created by - This would allow a script or a workflow transition to s...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Calendar view for all forms types

Calendar view of all due dates in "My Work" is great but a similar view for individual form types would be beneficial for users that need to triage work for specific forms types.
Ryan Posnikoff over 1 year ago in SYNCHRO Control / Forms 1 Future consideration

Markup Photos

Ability to markup photos (Asked about this on demos)
Thomas Schimpf over 3 years ago in Field / Forms | Media 0 Planned

Upload plan sets from PW and documents section

Currently the workflow requires a download from the source (PW or project documents) and an upload to plan set. That leaves up to 3 copies of the same file.
Dan Sheldon over 3 years ago in SYNCHRO Control / Documents / Plan Sets 1 Future consideration

Ability to unlock locked folders by an Admin

A folder can be locked by any Role having corresponding permissions, however, there may be instances when the user is not available to grant access to the files.
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Multiple Colour Modes In 1 3D View

Being able to have multiple colour modes in 1 3D view will be very helpful as it allows you to be able to fully customize your outputs. An example of where this is useful could be showing the different pouring stages of concrete using activity tra...
Daniel Clayson over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement

Importing from Revit with metric reverts unit to feet unless settings are adjusted in 3D Import dialog

There is one bug I have found, it’s an easy fix but took a while to figure out: When importing spx files from revit using the import project, it will assume the default unit as feet even though revit and synchro are both setup in metric. The way t...
Guest over 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Remove Cost Code from a selection of items

Want to delete a cost code from a number of items, not one at a time, and not all the items assigned to the cost code.
Dan Sheldon over 3 years ago in SYNCHRO Modeler 0 Planned

Ability to have subproject

We need the ability to have multiple projects under one main project. I this example, see attached image. I have one main job number. And in this case 350 different airports or sub projects. Each project has the same folder structure in it. Right ...
Martin Price over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Compare button in Schedule view

The "Compare" button in the schedule viewer needs some tooltips or explanation on what its purpose is. What is the difference between the top and bottom slider buttons? It also seems a little "clunky" when sliding. See this attached video