Background: In our MTR workflow practice, we have some compliance rules for contractor to follow, e.g. in Reports,
MTR project team should generate and submit the report for contractor to review.
After that, contractor should review the report...
Hi, Following the recent update, we noticed that the Project ID is no longer visible in the project details. We would appreciate it if this could be reinstated, as it is important for our work.
Include a direct hyperlink to the specific Activity page from the Export Activities file
Our project team will frequently use the exported activities file for further analysis or comparison with other data for cross-checking, without the need to copy the activity ID and search for that in the filter, a direct link to the specific Acti...
Sorting in Time and Usage Matrix for People and Equipment, company, resource role etc
Currently the Matrix is set up to include People and Equipment in 1 table with sorting by Company, Role and Name. It is quite time consuming to have people and equipment mixed together. It would be good to be able to keep them separated and sortin...
Return Actual Cost to Work Inspector/Progress webpage
I note the New/Enhanced Feature for SYNCHRO Perform removed "Actual Cost" from the Progress page of the Work Inspector in 9-Jun-2024 update. This page reports "Revised Earned Cost" which is linked to the actual progress. This information is most u...
Image 1 Please allow to lock the attendance area which would aid sign in / out speed. Image 2 Allow amendments in app to change start/end in the Record Attendance section. Currently have to come in and make the amendments on the computer.
This would assist the personnel, specifically the HSSE team on site when there is an evacuation emergency to manage the entire process. Synchro can add features below that can be used during an emergency evacuation: Supervisors seeing the names of...
Ability to upload multiple photos in one go against a Perform Work Reference in the web
Currently, a user needs to upload one photo at a time and add a comment. This feature would allow a user to add multiple photos to a Work Reference (Activity or Event) in one go