Progress Measurement

Showing 11 of 1114

Show earned quantity in the tagged item (ROC) view, in the cell for "actual quantity", actual is earned when doing ROCs

When doing rule of credit milestones, we need to know the current earned quantity based the approved milestone percentages. We shouldn't have to go to another page to see this, it should calculate and show up in the tagged items page. changing "ac...
James Milroy 12 months ago in SYNCHRO Perform / Progress Measurement 1 Future Consideration

Allow display of WBS code in the quantity progress page

We frequently handle multiple activities with similar names due to similar nature in the same programme (e.g. submissions and approvals of similar installations). Without WBS code it is difficult to identify which specific work package it is about.
Pak To Hui 9 months ago in SYNCHRO Perform / Progress Measurement 2 Future Consideration

Composable Filters in Perform

Feature to allow a user to compose their own filters, based on the available fields, in the different Perform screens. As an example, a user in the Work Inspector could create their own filter, based on any/all of the Work Reference attributes, to...
Luke Read over 1 year ago in SYNCHRO Perform / Program/Schedule Collaboration 0 Future Consideration

Include filter for start and finish dates in the activity list view

To include actual start and finish date in the filter to view activities under the framework of the WBS.
Pak To Hui 9 months ago in SYNCHRO Perform / Progress Measurement 3 Future Consideration

To include percent complete at the activity list

Would it be possible to use a % complete tag to replace the fixed icon at the shortcut to progress tab?
Pak To Hui 9 months ago in SYNCHRO Perform / Progress Capture 3 Future Consideration

Option to automatically change the activity progress % to 100% when the finish button is pressed.

No description provided
Pak To Hui 10 months ago in SYNCHRO Perform / Progress Measurement 1 Will not implement

Option to Link Tagged Items to Revised/Current Qty/Hrs

Hi, would be great to have a tick box where I can select to make the activity's revised/current qty/hours, align automatically to whatever the tagged item list contains. When I import, it assigns to the Tagged item register and items values automa...
David Viola over 1 year ago in SYNCHRO Perform / Progress Measurement 0 Future Consideration

Add support for Notifiable Users to the Bulk Assign page

Bulk Assign currently allows a user to manage Owners, Subcontractors and Clients. This feature would allow Notifiable Users to be managed in the same way
Luke Read almost 2 years ago in SYNCHRO Perform / Program/Schedule Collaboration 0 Planned

There should be an option to sort the selected rows on Bulk Assign page.

Refer attached image. There may be a case where user selects multiple rows on multiple pages for assignment, But before assignment want to review what rows are selected. Currently there is no way other than going thro each page and check. It would...
Pankaj Lalsare over 1 year ago in SYNCHRO Perform / Program/Schedule Collaboration 0 Future Consideration

Ability to flag an activity and/or event to use either cost, daywork or sell rates.

Allows for activties to be used for different purposes ie. pricing schedule, dayworks or cost activities. The flag would determine which rate to use based on the project rates table allocation to a resource.
Jay Priddis over 1 year ago in SYNCHRO Perform / Progress Measurement 0 Future Consideration