The idea is to push the concept of work package further for vertical infrastructure and large building
Instead of being a form, have a complete environment dedicated to Work Package so we can deliver rich work instructions to the field
The new environment could have tabs at the top , on for technical document, one for instructions, one for change request, on for the test or inspections procedures to be conduct, on for vendor document and specifications etc.....
An iModel connection will be available to the user could see his location.
A user would be able to connect with his tablet on Sunday night, and retrieve all the work package for his team. Including a schedule ( 1 o 4 week schedule).
The work package will be link to the the field store. So on Monday the crew can pick up all the material and tools require from the field Storage.
This would be heplfull in large building project
https://youtu.be/b8K9okTEzcY?si=0HiLNh6j9ztmO7KO&t=587
https://youtu.be/1G1Bi32FfCs?si=d2KZnHXhrSfTiTBm&t=222
https://youtu.be/1G1Bi32FfCs?si=tlIQvqxF3J65P5Qu&t=122