Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1310

EVA graph video with a task list only showing current tasks

I wanted to show an EVA video showing the exact costs with tasks filtered only showing active tasks. At the current time using the WBS sorting there is no way to exclusively show the total project amount in the first task and the active tasks that...
Jordan Darien 3 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

To export worksheets to Excel with breakdown structure

It would be very useful when worksheets are exported to Excel to export its breakdown structure this names of summaries and indentions. Please, add this function.
Дмитрий Павлович Сергеев over 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Planned

Actions for Inspections

Previously created Actions/Scripts should not be deleted if the inspection forms are updated via Excel upload. The desired behavior is error messages in Actions if bindings are not found.
Shaohua Guan about 1 year ago in SYNCHRO Control / Inspection 0 Planned

Enable Bulk upload of Forms to edit existing form instances.

For owner/operators, edit the form instances in the csv file for multiple forms then upload the changes into Control for tracking. Suppliers not willing or able to access forms in web portal, send data via other apps. an owner/operator would have ...
Kerry Newbanks 3 months ago in SYNCHRO Control / Forms 0 Unlikely to implement

UI improvements: Project Start/Finish date and progress

Create a UI to select a start and end date for a project when creating it, and allow project parties to see the progress of the current project on the home screen.
HoSang Jeon 3 months ago in SYNCHRO Control 0 Future consideration

Ability to see Related Forms info through PBI Connector

No description provided
Arpit Prakash 8 months ago in SYNCHRO Control / Forms 0

Message or a Tooltip on not being able to upload a file directly from zip

Add a message that files need to be unzipped before it can be uploaded. When selecting a PDF from zip, I am able to drag & drop. I get an error message that the PDF failed to upload. Maybe include a message at the top stating files that are in...
Derryl Acosta over 1 year ago in SYNCHRO Control / Plan Sets 0 Likely to implement

Allow SYNCHRO Control forms to attach documents from Sharepoint repository

Many SP users do not like to maintain 2 data repositories, meaning they do not want to copy documents from SP into SYNCHRO document. They want to be able to attach documents residing in SP
Iwan Pribadi almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Microsoft Teams Integration

We would like to see the ProjectWise Web + Microsoft Teams integration expanded to support Synchro Control projects. Currently, we can add Control projects as Web pages in Teams, but we would prefer if we could use the PW Teams integration that we...
Brian Glaser over 1 year ago in SYNCHRO Control / Admin 0

Add some kind of functions to provide evidence for contractor endorsement in reports

Refer to Bentley support case CS0280359 (attached file) or below: Knowing that the design rational for "Reports" module from support, which the report generated and submitted by one party (e.g. contractor) will be reviewed and approved by another ...
Tat Man Leung 5 months ago in Perform / Daily Diary & Reports 0