Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Search results

Showing 63 of 63

FIlter Out user names in User List controls

When designing visibility in complex relation projects we need to add company specific role to AssignedUsers list to assure everyon from that company can see their forms. We can currently exclude the roles from a user list control but it will be m...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 1 Shipped

Multiple Colour Modes In 1 3D View

Being able to have multiple colour modes in 1 3D view will be very helpful as it allows you to be able to fully customize your outputs. An example of where this is useful could be showing the different pouring stages of concrete using activity tra...
Daniel Clayson over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement

Plan Set automation

When we create a plan set having to fill all mandatory field is time consuming. Most of the info could be fill upstream from PWDI. If we could have 1) An interface with attribute under PWDI and when importing the PDF to Synchro control those attri...
Luc Poulin 11 months ago in SYNCHRO Control / Plan Sets 0

Workpackage/plant set

The idea is to push the concept of work package further for vertical infrastructure and large building Instead of being a form, have a complete environment dedicated to Work Package so we can deliver rich work instructions to the field The new env...
Luc Poulin 11 months ago in SYNCHRO Control / Plan Sets 0

Undo feature (not rollback)

There is a lack of an "Undo" feature. In P6 we are able to go back if something was keyed in incorrectly. A rollback is not always practical. We would like the application to allow for 1-3 user undo requests.
Jason Summers over 3 years ago in SYNCHRO 4D Pro 0 Will not implement

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Versions of 3D models in iModel

This idea refers to using Synchro Control with an iModel with Projectwise Connections. When viewing the Connections I think it is essential to be able to see the version of the model, e.g. P03 or C06. The model version isn't listed on the Connecti...
Ruth Fuller about 2 years ago in SYNCHRO Control / Models 0

Give Project Admin More Control over Forms

1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
David Dudek Jr. about 2 years ago in SYNCHRO Control / Admin / Forms 0 Future consideration

"Move Forward/Back one step" feature request.

It would be nice to have the ability to view the animation while skipping forward by a unit of speed each time the user clicks, depending on the selected 4D speed (e.g. 1 week, 1 month, etc.) (this already exists in 4D Pro).
HoSang Jeon about 1 year ago in SYNCHRO Control / Model Viewer 1

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration