Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 225 of 1139

User Fields - Find and replace

Hi I'm after an easy way of renaming user field's names in bulk. Paraphs if we could do find and replace or be able to copy to excel and paste it back it would help. In our case would simplify the fields so they would not have long names...
David Félix over 2 years ago in SYNCHRO 4D Pro 2 Future consideration

Import IFC file problem

Hi While working with IFC and SYNCHRO, I noticed a problem ... When I import the IFC4 model into the Synchro, in many cases some elements of the building are removed and I think solving this problem will improve this software.
Amirhossein Afradi over 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Batch Render Viewpoint

I have several 3D still images for stagings that are saved in viewpoints. Everytime i need to activate then hit the report reder in iray button. Which means I will have to wait for all of my images to be rendered one by one. We should a have a bat...
Shuo Wang over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Planned

Shadows and ambient occlusion check boxes issue in animation export

Using synchro 6.4 I am having export issues: When I go to export an animation it ignores the shadows and ambient occlusion check boxes and there are either permanently on or off no matter what is ticked in the boxes. This also overrides the view i...
Guest over 2 years ago in SYNCHRO 4D Pro / Animations 0 Planned

Splitting or pausing/resuming of tasks

In execution phase, a planned task could have a duration of 30 days, which sometimes must be splitted/paused in the weekends or some hours for a night or two due to some other delays, before restarting the task -in that way, I don't think it is co...
Guest almost 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Create extrusions from 2D drawing to animate construction sequence without 3D model

At an early planning stage or if the project does not have 3D models, construction sequence can be created from 2D shapes. A valuable improvement would be a way to quickly create extrusions from 2D drawings (e.g. DWG or PDF) to quickly create a "m...
Kate Hester about 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Allow users to see full calendar names in Task Properties> General

Currently if users have calendars with long names, they can be cut off in Task Properties> General> general> calendar picker. This discourages users from using Pro as a plannning/ scheduling tool. Provide a way to see full calendar names,...
Dimitrios Mitritsios about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Planned

Unnecessary information exported with MicroStation plugin

while exporting spx from MicroStation, the plugin exports 'Workset' header and other shared cell definitions which not required... it will be good not to export them as there is no use of them for building 4D.
Ohsung Kwan about 3 years ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 1 Will not implement

Resource & 3D User Fields that are created/updated in 4D to be accessible in Control, Modeler & Field

Resource & 3D User Fields that are created/updated in 4D to be accessible in Control, Modeler & Field. This is important because as we package work in 4D, populating these user fields would enhance QTO's in modeler (via queries) and filter...
Doug Theret about 3 years ago in SYNCHRO 4D Pro 1 Planned

Improved condition for Auto-Matching

Guest over 3 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration