Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1332

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya about 1 year ago in SYNCHRO Control / APIs 0

When creating a workflow and deciding which Properties should be Enabled or Disabled based on workflow status, we only want to see the bindings associated to the form we are working on, not all Bindings in Control. This can be confusing.

When deciding which bindings so be enabled or disabled within a workflow it would be helpful to see on the bindings associated to the form we are working with. Right we have a view of all bindings.
David Dudek Jr. about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Synchronization of tasks from .sp files schedules by Task ID without use of GUID.

In the settings menu there is an option for Primavera P6 to use activity IDs for synchronization. The same option for Synchro .sp files (and other formats) would be very useful as synchronization from external data goes through GUIDs by default. B...
Varvara Kleshchevnikova over 3 years ago in SYNCHRO 4D Pro / Integrations 0 Future consideration

Data Visualization multiple search capabilites

Would like to have the ability to use advanced search parameters and multiple queries of model properties to refine data visualization searches.
Kerry Newbanks about 2 years ago in SYNCHRO Control / Civil Tools 1

Add legend of ActivityCode Values in Gantt while in 'Activity Code Color' Mode

We're using the activity code color model to define tasks for multiple companies. But it's not possible to add a legend to the Gantt to define the colors.Legend must be suitable to show both ACV and/or ACV Description
Bram Wildekamp about 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1

Saved layouts for Usage Matrix

Ability to create, save and share layouts of the Usage Matrix
Luke Read about 2 years ago in Perform / Timesheets 0 Future Consideration

Aggregated dashboard to show work items (forms) for all projects

Proof of concept has been completed by atkins team members. having this dashboard function embedded within controls would be of significant value to senior stakeholders across the project
Leon Simmons over 1 year ago in SYNCHRO Control / Reports 0 Future consideration

Ability to see when a form was created in the register/list view

Please, provide ability to expose the date created for form instances in the List view. A built in property that can be exposed from the three vertical lines.This will help track changes and resolve issues. Current case is where a cascade was refr...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Planned

Add functionality for 3d Connexion Spacemouse

Could capabilities be added for using a 3d Connexion Spacemouse? Currently, I can only zoom in and out - no rotation. It seems this would only require communication with their software development department.
Dennis Parker about 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Enable Linked/related/escalated forms to be exported with the Parent

Provide ability to export linked/related/escalated forms with on of the Donor/Parent forms. E.g. Form A is related to Form A.A. Click checkbox in front of Form A and select Export to PDF. Choose all standard parameters. Provide additional toggle t...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration