Scripts - Equation Builder - "Squared" and "Square root" functions needed

A square root function and a "squared" function are both needed within the equation builder function
Ashley Edmonds about 2 years ago in SYNCHRO Control / Forms 0 Shipped

Need a scroll bar for Initialization Settings

I cannot see the Transitions or Save option without zooming out the browser -
Arpit Prakash about 2 years ago in SYNCHRO Control 0 Shipped

Scripts - Equation Builder

More functions within the equation builder (similar to MS Excel) that allow more processing of whole and decimal numbers (e.g. splitting a decimal from the whole number)
Ashley Edmonds about 2 years ago in SYNCHRO Control / Forms 1 Shipped

Ability to search for Bindings for a Grid


Arpit Prakash about 2 years ago in SYNCHRO Control 0 Shipped

Provide a way to add a different sized QR Code

Sometimes depending on the sheet size and graphical content, I want to place a slightly smaller QR Code so it does not interfere with the page content
Paul Johnson over 2 years ago in SYNCHRO Control / Plan Sets 0 Shipped

Slow down 4D simulation speeds

Playing the simulation under the Schedule tab, even with Day and Slow Speed options selected, is too fast for projects that are being tracked on an hourly basis (eg emergency train outage, Shutdown / Turnaround) The same goes for reviewing simulat...
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Shipped

Allow bulk update for Plansets sheets

With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...
Hasham Kiani over 2 years ago in SYNCHRO Control / Plan Sets 0 Shipped

On/Off switch for scripts

Hi, whilst testing forms with multiple scripts it is necessary to isolate some scripts to find the culprit. Ability to switch scripts on/off would is much needed.
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 0 Shipped

Use original sheet QR code placement when revisioning a sheet

When placing a QR code on a revisioned sheet - the starting placement location for that QR Code should be the QR Code location set in the original sheet.
Paul Johnson over 2 years ago in SYNCHRO Control / Plan Sets 0 Shipped

Place QR Code on selection set of sheets at one time

We need to have the ability to place a QR code on multiple sheets in a single action as moving it from the current default location on hundreds of individual sheets takes hours to perform and is not efficient.
Paul Johnson over 2 years ago in SYNCHRO Control / Plan Sets 0 Shipped