Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 252

Reflect simultaneous activities with different locations in a 4D animation

In road projects where there are different sections and different construction elements in which there are several tasks occurring at the same time in different locations, I would like to reflect simultaneous tasks with different locations in a 4D...
Sergi Ferrater about 1 year ago in SYNCHRO 4D Pro / Animations 1

SYNCHRO 4D Pro/Scheduler/OpenViewer to be certified on Windows 11

No description provided
Shaohua Guan over 3 years ago in SYNCHRO 4D Pro 1 Planned

Make all task properties available as columns within the task table.

Have all task properties available as columns within the task table. The user is currently required to run a script to push data to a user field to make visible in the task table. For example budgeted labor units, actual labor units, remaining lab...
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

User Fields - Find and replace

Hi I'm after an easy way of renaming user field's names in bulk. Paraphs if we could do find and replace or be able to copy to excel and paste it back it would help. In our case would simplify the fields so they would not have long names...
David Félix over 3 years ago in SYNCHRO 4D Pro 2 Future consideration

Import IFC file problem

Hi While working with IFC and SYNCHRO, I noticed a problem ... When I import the IFC4 model into the Synchro, in many cases some elements of the building are removed and I think solving this problem will improve this software.
Amirhossein Afradi over 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Shadows and ambient occlusion check boxes issue in animation export

Using synchro 6.4 I am having export issues: When I go to export an animation it ignores the shadows and ambient occlusion check boxes and there are either permanently on or off no matter what is ticked in the boxes. This also overrides the view i...
Guest over 3 years ago in SYNCHRO 4D Pro / Animations 0 Planned

Import pdf to make staging plans

Allow for the import of 2D pdf drawings and to add markups to the drawing in synchro. The markups, for example lines, hatches or text are linked to activities so a 2D staging book can be made.
Michiel Janssens almost 5 years ago in SYNCHRO 4D Pro 0 Future consideration

Splitting or pausing/resuming of tasks

In execution phase, a planned task could have a duration of 30 days, which sometimes must be splitted/paused in the weekends or some hours for a night or two due to some other delays, before restarting the task -in that way, I don't think it is co...
Guest almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Automatic to Create 3D path

Because there are more and more PPVC projects on the market, and each project will have at least hundreds to thousands of moduels, if each module has its own position x, y, z, and we list this information in excel and import it into Synchro. If Sy...
Guest about 5 years ago in SYNCHRO 4D Pro 0 Future consideration

Allow user to specify key used for mapping

When we import Excel File to SYNCHRO, It is good it can accept other data as the Mapping Key, not only the SYNCHRO Standard ID. Please check the PDF file attached in more details.
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro / Import/Export 4 Planned