Search results

Showing 9 of 9

Trailing zeros not showing up on the "Decimal" Numberbox Field

Currently, trailing zeros (trailing zeros are a sequence of 0 in the decimal representation of a number, after which no other digits follow ) do not show up, when using a "decimal " numberbox field . There should be a button (per example) allowing...
Miguel Meninas 9 months ago in SYNCHRO Control / Forms 0

Roll up progress/costs to WBS parents

Currently there is no relation between tasks and their subtask, even in rules of credit, you could have all subtasks at 100% but the parent still sits at 0% as a manual input.
Rick Winsor 8 months ago in Perform / Progress Measurement 0

Add User field Drop down list feature

Further to our Customer suggestion, it would be very usful to have a Drop down list feature for User defined Field. It could be the list with the values to be selected from the same formula in the field value, or (to save ASCII script text) is ref...
Pavel Khrapkin almost 3 years ago in SYNCHRO 4D Pro 0

A New Task Filter Allowing You To Filter Based On Assigned Resources

We require this feature because we need a quick way of filtering tasks without/with any resources assigned after doing a programme synchronisation. Currently the only way to do this is by filtering the resources manually, however, when you import ...
Daniel Clayson over 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Cost type issue for different resource types

If you add cost to e.g. a resource and you edit the details in the resource properties widget then you get the following options for the type: Also note that the default effective date defaults to 1/2/1970. I think there’s probably no use case atm...
Dimitrios Mitritsios over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Shipped

Summary View does not Work

The Summary view does not work, in the user/project summary non of the custom forms created displays as overdue, close to deadline etc. In the attached screenshot it displays as 0.
Guest over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Progressing task by R units

DD is set to 12/7/2020 Create a task and assign a resource to the task. Resource is set to Driving. Duration will change if the planned units/ time is changed. Planned units will change if Duration is changed. Set DD to 12/8/2020. Set Progress to ...
Guest over 4 years ago in SYNCHRO 4D Pro 0 Shipped

Make work visualisation clearer

Work visualisation in control is unclear on time. Confusion between 12pm and 0:00pm
Philip Wheeler about 2 years ago in SYNCHRO Control 0

Objects appear to be zigzagged or distorted after import into Pro from nwc

All files are available here: https://bentley-my.sharepoint.com/:f:/r/personal/jacqueline_chen_bentley_com/Documents/Documents/SYNCHRO%20-%20Core/Shared%20with%20Kate/Aha%20Support/SYNCHRO-I-393?csf=1&web=1&e=FQnbcS Open nwc, export spx, t...
Guest almost 5 years ago in SYNCHRO 4D Pro / Integrations 0 Shipped