PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1335

Gantt Chart with feature to collapse/expand to a certain WBS Level combined with timeline display

At the moment the timeline is only used as a focus time slider feature. Vizualization of the underlying schedule will be very helpful to a understanding of the work ahead. It would be very nice to have the possibility to have the focus time slider...
Brigt Rykkje about 5 years ago in [Archive] SYNCHRO 4D Review 0 Planned

Save Form Histroy

When user use form for check list. User want to save the check list history. So user can see what is failed on first check list. with the comment and Photo. This is reqested by RWS singapore, and nPulse has this feature.
Indrawan Wijaya almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Allow 'user' specific configurations for layout and filters in additional to the existing 'global' configuration

Global and user settings for filters and layouts. Filters could be overwritten by other users. Filters being assigned to a "global" permissions or "user only" are keys to our ability to work individually as schedulers and support our project. A gr...
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Adding Lag values in Task Properties> Links> Predecessors/ Successors do not consistently behave properly

Care must be taken when adding Lag values. This function did not work properly each time. The buttons in the task properties links dialog box were sometimes very touchy and did not function properly. In some cases the correct selection of a button...
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 4 Planned

Logic tracing when activities are filtered - See attached video for additional details

The inability to filter activities and trace logic where the next activity would show in your visual is a major issue that affects our reporting of critical paths. Those paths can be coded but should be traced rather than simply relying on a code ...
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Planned

Transparency on Resource Codes and Activity Codes

Every now and then need to do workarounds because resource or activity codes can only be shown as solid colours on the 3D view. Would be good if it was possible to allow for them to be transparent.
David Félix over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Future consideration

Use of wild cards within Script

Hi, Would it be possible to implement wild cards within SYNCHRO Script? Example: I have the following User Fields: ABCD, ABED, ABBN, ABLM, ABHJ, ABDH, etc. I would like to sum all their values with something like SUM UFV("*AB*"). This would be ver...
Alexandru Buzan over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 3 Future consideration

Dockets: allow users to have the ability to approve in bulk.

Although the Docket Inbox allows a user to approve multiple Dockets, it is limited to a single day and still requires the user to select dockets individually.
Luke Read almost 2 years ago in EVM (Perform) / Dockets 0 Future Consideration

Visibility of tasks assigned to 3D elements

When selecting an element, there is no information to be found about the assigned activities. It would be helpful to have an information window with the assigned tasks and corresponding start and end dates and assigned appearance profiles, when th...
Brigt Rykkje over 5 years ago in [Archive] SYNCHRO 4D Review 0 Planned

Add more controls to 4D sequence playback

Currently user can play sequence at three different speed; user can also pause the playback. User would want to step forward and backward to see static visual plan on a specific day, to talk about it and discuss with the team. Consider includi...
Jacqueline Chen over 5 years ago in [Archive] SYNCHRO 4D Review 0 Planned