Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1297

Admin transitions

When form is used by users, sometimes there are batch of them that need to be deleted/archived/changed to a specific status. In cases where form is deleted, that leaves a gap in the numbering system and questions further down the line, so it is be...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

Ability to unlock locked folders by an Admin

A folder can be locked by any Role having corresponding permissions, however, there may be instances when the user is not available to grant access to the files.
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Activity Code Descriptions in the Scheduler

Primavera P6 allows for viewing activity code descriptions for grouping tasks rather than just the activity code. The activity code is usually a batch of symbols due to P6'es character limits for activity codes and that makes it a real pain in Syn...
Patryk Makowski 9 months ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 7

Export forms summary or grid view of forms with photos to single pdf

user should be able to export forms summary or grid view of forms with photos to single pdf
Manoj Jamma over 3 years ago in SYNCHRO Control / Reports 0 Future consideration

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail about 2 years ago in SYNCHRO 4D Pro / Animations 0

At completion calculations

at completion calculation is depending on the duration and expected finish not the inputs of actual and remaining units as per primavera So we have the following: There is no input place for the at completion units on synchro like primavera P6 The...
Rana Hosney over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

[Gantt] Task filtering/searching

A schedule can be quite lengthy, therefore to improve user experience, it would be a good idea to implement task filtering for user to filter by one or multiple columns using some operation and criteria.
Guest over 3 years ago in [Archive] SYNCHRO 4D Review 0

Selecting 3d element in Control iModel should highlight the corresponding element in the 3D hierarchy

Currently it is possible to highlight the elements when user selects the model or any node from the model tree/ hierarchy. However the model/ node will not be highlighted/ expanded if the element is selected from the model viewer. It would be bett...
Guest over 3 years ago in [Archive] SYNCHRO 4D Review 0

Include 3D Filters created from Pro in the Control iModel

Currently there is no easy way to access the 3D Filters created in 4D Pro in the Control model viewer. 3D Filters can be used to isolate objects and load models quickly.
Guest over 3 years ago in [Archive] SYNCHRO 4D Review 1 Future consideration

export multiple escalated forms in one PDF

if form A is escalated to form B, each form need to be exported separately. have the option to export both forms in one PDF document if one form is escalated to another.
Siti Nurhazirah Mokmin over 3 years ago in SYNCHRO Control / Reports 0 Future consideration