Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1299

EVA graph video with a task list only showing current tasks

I wanted to show an EVA video showing the exact costs with tasks filtered only showing active tasks. At the current time using the WBS sorting there is no way to exclusively show the total project amount in the first task and the active tasks that...
Jordan Darien about 11 hours ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Enable Bulk upload of Forms to edit existing form instances.

For owner/operators, edit the form instances in the csv file for multiple forms then upload the changes into Control for tracking. Suppliers not willing or able to access forms in web portal, send data via other apps. an owner/operator would have ...
Kerry Newbanks 1 day ago in SYNCHRO Control / Forms 0

UI improvements: Project Start/Finish date and progress

Create a UI to select a start and end date for a project when creating it, and allow project parties to see the progress of the current project on the home screen.
HoSang Jeon 2 days ago in SYNCHRO Control 0

Import/Export Options settings in Synchro 4D Pro

My idea is to enable import and export of settings in synchro and here's why it can be useful. In my company, together with my team, we work together on projects where time counts. Often one person takes over something that the other was doing. Th...
Marta Raczyńska 14 days ago in SYNCHRO 4D Pro / Import/Export 1

Drag Predecessors and Successors

Would be faster if someone could click and drag multiple activities into the predecessor or successor boxes instead of linking in the gnatt view or right clicking and finding the task.
Kate Brownhill 2 days ago in SYNCHRO Control / Schedule 0

Match element transparency as defined in a DGN

Some items we may want permanently to show as transparent, like terrains which may have elements below them that we still want to see.
Arpit Prakash 9 days ago in SYNCHRO Control / Model Viewer 0

Ability to download a previously uploaded cost code excel sheet.

if you have a user who originally created a cost code excel spreadsheet upload, and they leave the company, we have no way to download and/or update the cost code structure without a version of the file. Currently you need the original spreadsheet...
Corey Johnson 10 days ago in SYNCHRO Modeler 0 Needs review

add to the control bar move on one step and back one step l

In the 4D scheduler, add to the control bar move on one step and back one step like in the 4D pro version?
Ryan Somes 8 days ago in SYNCHRO Control / Schedule 0

Screen capture integration

Provide an integration with the screen capture capability of a mobile device to save captures to Field Documents folder or connected PW folder. Current workflow of user takes a screen capture then must go into device gallery and manually move scre...
Kerry Newbanks 2 months ago in Field / Documents | Connections 0

Model location sets map location

When creating forms in the model view it would be good to have the pin in the model view added to the same location in the map view. This will reduce the number of entries a user has to make when creating a form, so the user does not have to have ...
Kerry Newbanks 2 months ago in Field / Forms | Forms 0 Future Consideration