Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1342 of 1342

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Batch Render Viewpoint

I have several 3D still images for stagings that are saved in viewpoints. Everytime i need to activate then hit the report reder in iray button. Which means I will have to wait for all of my images to be rendered one by one. We should a have a bat...
Shuo Wang almost 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 2 Planned

Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph

Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...
Sourav Kumar 12 months ago in SYNCHRO 4D Pro / Animations 0

Integrate Rules of Credit into mobile app (properly)

Currently the rules of credit progress update interface is an 'iwindow'(?) which completely crashes when opened in the windows app.It is currently only available as an add-on you need to request. It is already a tabbed viewer, it doesnt make any s...
Rick Winsor 12 months ago in EVM (Perform) / SYNCHRO Perform Mobile 0 Future Consideration

Roll up progress/costs to WBS parents

Currently there is no relation between tasks and their subtask, even in rules of credit, you could have all subtasks at 100% but the parent still sits at 0% as a manual input.
Rick Winsor 12 months ago in EVM (Perform) / Progress Measurement 0 Future Consideration

Allow scope items to have "Create and Add Another"

Creating hundreds of scope items is tedious and if we are not allowed to use an upload spreadsheet, this would at least eliminate 5 mouse clicks per ite,
Rick Winsor 12 months ago in EVM (Perform) / Administration 0 Future Consideration

Information Density

Make the info density higher to get a better usage of the space
Luc Poulin 12 months ago in Field / Forms 0

Rotate cell for grid view

When viewing plant set on a cell, if we rotate 90 for a landscape view, display a grid view of the documents
Luc Poulin 12 months ago in Field / Documents | Plan set 0

Customise display

Under the Plan Set Allow the Admin to configure which information will be display or best case allow user to create their own display configuration. At the moment we see only name, version and discipline
Luc Poulin 12 months ago in Field / Documents | Plan set 0

Display thumbnail

Under synchro Plan Set, have the option to display thumbnail reason is we have pant set with 100 or document per discipline and having thumbnail open a new way to look for a drawings. This will allow browsing like a photo gallery
Luc Poulin 12 months ago in Field / Documents | Plan set 0