Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Utilization Graph.
Because of this issue, the dates in the 3D Animation do not match with the dates in the Graphs. If there was an option to be able to set the dates of the Graphs that would make things easier and more logical in Animation Export.