PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1301

Display Photo Count within Media Indexing

Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
Guest over 3 years ago in SYNCHRO Control / Media Indexing 0 Future consideration

How to determine which element of the model the task is assigned to?

By clicking on a task in the diagram, we see only the assignments of the task, but we do not understand which elements it is assigned to. Perhaps you should add the function of displaying only the elements assigned to the selected tasks (isolation...
Guest over 3 years ago in SYNCHRO Modeler 0 Planned

Add functionality for 3d Connexion Spacemouse

Could capabilities be added for using a 3d Connexion Spacemouse? Currently, I can only zoom in and out - no rotation. It seems this would only require communication with their software development department.
Dennis Parker over 1 year ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.

Currently in synchro Control \ Schedule the animation is starting at the Project Start Date. Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas almost 3 years ago in SYNCHRO Control 1 Future consideration

Add cost codes within modeler tree and have capability to export cost code configuration.

The default format of setting up a cost code configuration to attach to a model is too rigid. It is almost impossible to determine which codes will need to be incorporated for a design build project model. As designers update models more codes wil...
David Gallaher over 1 year ago in SYNCHRO Modeler 0 Future consideration

Ability to filter/select PDF settings plan sheets by user defined tags.

In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
David Gallaher over 1 year ago in SYNCHRO Control / Plan Sets 0 Future consideration

Ability to change status of more than one form at a time

Having to manually turn each form from published to draft just takes too long
Guest over 3 years ago in SYNCHRO Control / Forms 2 Future consideration

Exported 4D synchro .fbx format when linked with 3ds max file texturing is not possible

Our Team is working on one project and our scope is to export 3D model from synchro as .fbx file and link that file into 3ds max to create rendering according to the planned dates from schedule because we need to update that file multiple times as...
Trishi Ashware over 1 year ago in SYNCHRO 4D Pro / Import/Export 1

Imodel Saved Views - Don't turn on new content by default

Currently, if we add new levels or new references to our source DGN files and then re-sync imodels, those new elements get turned on in every saved view. We don't want this. We want the option to turn on new content but to not have it alter our ex...
Ariel Froerer 5 months ago in SYNCHRO Control / Model Viewer 0

Add current progress % next to progress bar for each activity in "All Activities" page

This is an idea from our programming team, which they find it very useful if can directly know the progress of each activity, with the aid of filtering function and WBS, instead of going to another page like "Quantity Progress", which doesn't have...
Tat Man Leung 5 months ago in Perform / Program/Schedule Collaboration 0