Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1287

Mapped Master Dataset for forms

Would like to see a Master dataset hosted via Excel spreadsheet (or similar) that contains all Master data for a Control project and specifically the information commonly referenced via dropdown lists and pick lists on custom forms. Suggested that...
Matthew Blake over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

the Auto - Sent By column (same like Created By Column)

For the Form it is good to have the Sent By Column, to identify who is the previous user.
Indrawan Wijaya over 1 year ago in SYNCHRO Control / Forms 2 Will not implement

Infrastructure Cloud - Help Link only Show ProjectWise Link

When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
Indrawan Wijaya 5 months ago in SYNCHRO Control / Admin 0

Any user field attributes from 4D Pro or Modeler are not visible in Control

Synchro Control model do not show any user field attributes added from 4D Pro or from Modeler. These attributes must be visible.
Manoj Jamma about 3 years ago in SYNCHRO Control / Models 0 Future consideration

New folder structure

In the 'Work' area as you add more forms the list just gets longer. It would be a good idea to have an expanding folder structure instead of a long list, as it is easier to navigate. This also assists with identifying different work areas and what...
David Beer 10 months ago in SYNCHRO Control / Forms 0 Future consideration

Ability to map the date tied with a Signature control seperately to a fillable pdf

Arpit Prakash 5 months ago in SYNCHRO Control / Forms 0

Place the attachments in a PW folder

Each time attachments are added to a form, they should be saved directly to a specific folder in the project.
Yessica Andrade Barbosa 5 months ago in Field / Documents | Connections 0

Data Visualization multiple search capabilites

Would like to have the ability to use advanced search parameters and multiple queries of model properties to refine data visualization searches.
Kerry Newbanks over 1 year ago in SYNCHRO Control / Civil Tools 1

Add legend of ActivityCode Values in Gantt while in 'Activity Code Color' Mode

We're using the activity code color model to define tasks for multiple companies. But it's not possible to add a legend to the Gantt to define the colors.Legend must be suitable to show both ACV and/or ACV Description
Bram Wildekamp over 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1

Saved layouts for Usage Matrix

Ability to create, save and share layouts of the Usage Matrix
Luke Read over 1 year ago in Perform / Timesheets 0 Future Consideration