Right now, Field only can do progressing if the Resource directly link to Task, progressing is not working if we link resource group to task. In Pro, sometime we need to link resource group to task for better grow simulation. Need to improve Field...
There Should be a possibility to set a Control with a pin. That means when you choose it you should be able to set a Pin to save this Control Value. E.G: when you collect defects on the same level you don't need to fill the Level every time for ea...
Slice an object by typing the number of equal parts wanted
In Synchro Pro, it was possible to subdivide an object by stating the number of cuts you wanted (using rows or columns). This was helpful when you wanted to divide an object into equal parts. In Modeler, you have to state the distance between each...
Ruth Fuller
over 1 year ago
in SYNCHRO Modeler
0
Needs review
Additional Features Synchro Control - Power Bi plug in
Hey, I was testing out the Synchro Control - Power Bi plug in and ran into a little issue. Not all the information I wanted was getting exported and some data I wasn't interested in was. Is it possible to add in a feature so we can determine which...
Reduce Bindings in Form designer to system and form specific ones only
When creating forms or workflows, the system shows all bindings per form type. It is unnecessary clutter and hard to navigate to the ones actually specified for the form in question. This leads to longer times developing forms and increased testig...