Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1337

Ability to see Section info against each Control through PBI Connector

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Allow users to enable model version comparison in SYNCHRO Control interface

No description provided
Guest about 2 years ago in SYNCHRO Control / Admin 1 Future consideration

Within the PDF Plan sets text search

I would like a "google" like search of all the text to locate street names and lot numbers across the PDF set. I would like to search for the matching sheets and when in the sheet see the matching text strings
Bill McNamara almost 5 years ago in SYNCHRO Control / Plan Sets 0 Already exists

[07] Progressing Task

Need to able give progress on task level in the Field App.
Guest over 4 years ago in Field / Status update | Tasks 0 Planned

Scaling of 3d object even after path is assigned

Unable to scale a 3D equipment after 3D path assignment and resource assignment to the task. Now, the erection scheme may change according to site conditions; in this case, to fix it, we always have to delete the 3D path and then recreate it, whic...
Vishal Khurana 7 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Model view - Don't show Work Assigned panel in Model View for Guest Users

When a Guest User logs into construction.bentley.com to view the 4D model they have to click on the Model icon in the top right corner to load up the 4D model. When the model loads up, the bottom half of their screen shows a panel that lists out w...
Ruth Fuller over 1 year ago in SYNCHRO Control 0

Add favorites on forms

Ability to favorite some forms so they can be easily prioritized in a grid view.
Manoj Jamma about 1 year ago in SYNCHRO Control 0 Future consideration

Slice an object by typing the number of equal parts wanted

In Synchro Pro, it was possible to subdivide an object by stating the number of cuts you wanted (using rows or columns). This was helpful when you wanted to divide an object into equal parts. In Modeler, you have to state the distance between each...
Ruth Fuller about 2 years ago in SYNCHRO Modeler 0 Needs review

PDF Output - Data Grid Title Not Cutted

When export data grid to a PDF, if the column have long name, the title will be cutted. Hope the title can auto wrap to next line. and combive to data Grid Title Style enable is good.
Indrawan Wijaya about 1 year ago in SYNCHRO Control / Forms 0

Synchronization of tasks from .sp files schedules by Task ID without use of GUID.

In the settings menu there is an option for Primavera P6 to use activity IDs for synchronization. The same option for Synchro .sp files (and other formats) would be very useful as synchronization from external data goes through GUIDs by default. B...
Varvara Kleshchevnikova almost 4 years ago in SYNCHRO 4D Pro / Integrations 0 Future consideration