Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1287

Attachments within Transition Button

It would be usefull to have a way to also include attachments, as we do through the normal PDF export (in a folder for attachments), using the transition button in the workflow
Joana Isabel Neves Gomes 2 days ago in SYNCHRO Control / Forms 0 Future consideration

Composite iModels not usable for Synchro scheduling

Please add the option to use the composite iModels for Scheduling services, now it's not possible to filter out data from an existing iModel and start working with Synchro 4D
Christiaan Post 1 day ago in SYNCHRO Control / Models / Schedule 0

Email notifications showing mis-leading information

Ability to change the basic email notification sent out. Currently the email notification includes info like Created by and Created on, which COUNTERINTUITIVELY tells the user who has DESIGNED this form and WHEN IT WAS DESINGED.. instead of showin...
Irena Seleznjova 2 days ago in SYNCHRO Control / Forms 0

Allow documents connections to different sources

Having a connection to ProjectWise is good, but consulting organizations use multiple document systems. To simplify workflows for consulting organizations with multiple documents sources working with owner/operators, contractors, other consultants...
Kerry Newbanks 3 days ago in SYNCHRO Control / Documents 0 Future consideration

Provide hosting service for Apps/scripts

Provide hosting service for apps/scripts to run on cloud service as a backend. Provide options for python, php, javascript with working IDE to allow users to develop in sandbox mode and run in production mode service application scripts that inter...
Kiril Tasev 4 days ago in SYNCHRO Control / APIs 0

Import/Export Options settings in Synchro 4D Pro

My idea is to enable import and export of settings in synchro and here's why it can be useful. In my company, together with my team, we work together on projects where time counts. Often one person takes over something that the other was doing. Th...
Marta Raczyńska 23 days ago in SYNCHRO 4D Pro / Import/Export 1

Critical Path in Visual Reports/Animations

Any chance or option to view critical path elements in the model while running the animation?
Ameya Talekar 8 days ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 0

KPI Pie charts, Progress figures in animation

Considering the synced schedule to be cost and resourse loaded, is there a R&D in progress or any option already available to view KPI's in the animation video without needing to buy additional package from the third party?
Ameya Talekar 8 days ago in SYNCHRO 4D Pro / Animations 0

EVA graph video with a task list only showing current tasks

I wanted to show an EVA video showing the exact costs with tasks filtered only showing active tasks. At the current time using the WBS sorting there is no way to exclusively show the total project amount in the first task and the active tasks that...
Jordan Darien 9 days ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Ability to download a previously uploaded cost code excel sheet.

if you have a user who originally created a cost code excel spreadsheet upload, and they leave the company, we have no way to download and/or update the cost code structure without a version of the file. Currently you need the original spreadsheet...
Corey Johnson 18 days ago in SYNCHRO Modeler 0 Needs review