Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1301

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 1 Future consideration

Being able to add KMZ file to a individual form

Being able to add KMZ file to a individual form
Misti Daigle 3 months ago in SYNCHRO Control / Forms 0

Stamp a PDF with a custom stamp via a Web Services API call

(MUST) As a Bentley developer I want to be able to stamp a PDF file with an image/text via a Web Service API call using PDFTron (Apryse). (MUST) As a Bentley developer I want to be able to specify the location of the stamp to allow for positioning...
Paul Houghton 7 months ago in SYNCHRO Control / APIs 0

Add button File Upload in the Form

At the moment, it is not possible to add the 'File Upload' button to forms; only a button with 'Add Attachment' appears at the end of the forms. The introduction of this button would be quite useful, even for multiple additions, because in this wa...
Joana Neves Gomes 10 months ago in SYNCHRO Control / Forms 1

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 1 Future consideration

IFC Export

Hi the IFC export is very limitign: Only ifc 2x3 can be exported The PropertySets disappear and the ObjectTypes are not exported in the right way. I kindly ask you, to improve the IFC export as this file format is very popular and regularly used f...
Manuel Kraehenbuehl over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino 7 months ago in Perform / Reports 1

Delete or archive project templates

Organization admins may create multiple project templates and determine that some, or many, should be deleted or archived due to changing template needs. An admin should have the ability to select from a list of the project templates any that shou...
Ryan Posnikoff almost 2 years ago in SYNCHRO Control / Admin 1 Planned

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya 7 months ago in SYNCHRO Control / APIs 0

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta over 3 years ago in SYNCHRO Control / Forms 2 Planned