Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1298

Ability to Tag members in the Comments

It would be great if you could Tag members in comments which would trigger a notification, and discussion
Kevin Vivien about 3 years ago in SYNCHRO Control / Forms 2 Future consideration

Add new sort/filter feature for Dockets (sort/filter by cost code)

This feature will be very useful as our project is set-up via cost-codes. So sorting/filtering via cost-code will be very important
Rocky Ursino 3 months ago in Perform / Dockets 0

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 1 Future consideration

IFC Export

Hi the IFC export is very limitign: Only ifc 2x3 can be exported The PropertySets disappear and the ObjectTypes are not exported in the right way. I kindly ask you, to improve the IFC export as this file format is very popular and regularly used f...
Manuel Kraehenbuehl over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Delete or archive project templates

Organization admins may create multiple project templates and determine that some, or many, should be deleted or archived due to changing template needs. An admin should have the ability to select from a list of the project templates any that shou...
Ryan Posnikoff almost 2 years ago in SYNCHRO Control / Admin 1 Planned

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta about 3 years ago in SYNCHRO Control / Forms 2 Planned

Support to bulk upload Rates in Perform

Current method of loading and updating rates individually into Perform needs the ability to bulk create and needs to include notation to allow information on source
Ernest Downes over 2 years ago in Perform / Dockets 0 Future Consideration

Need updated SYNCHRO 4D Pro plugin for Navisworks 2023

No description provided
Arpit Prakash over 1 year ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 1 Planned

Actions for Inspections

Previously created Actions/Scripts should not be deleted if the inspection forms are updated via Excel upload. The desired behavior is error messages in Actions if bindings are not found.
Shaohua Guan 10 months ago in SYNCHRO Control / Inspection 0 Planned

Export to Synchro plugin for Revit 2024

Export to Synchro plugin for Revit 2024 to be introduced soon as many of our projects is on hold due to this.
Abhijiti joshi over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Planned