Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 242

Automatic to Create 3D path

Because there are more and more PPVC projects on the market, and each project will have at least hundreds to thousands of moduels, if each module has its own position x, y, z, and we list this information in excel and import it into Synchro. If Sy...
Guest almost 5 years ago in SYNCHRO 4D Pro 0 Future consideration

Create extrusions from 2D drawing to animate construction sequence without 3D model

At an early planning stage or if the project does not have 3D models, construction sequence can be created from 2D shapes. A valuable improvement would be a way to quickly create extrusions from 2D drawings (e.g. DWG or PDF) to quickly create a "m...
Kate Hester over 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Import https://dotbim.net/ .bim file format

https://dotbim.net/
David Félix over 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Import/Export Keyframe of 3D Path

Hello Team, I know that we can copy/pas keyframe as text . This function requires to realize for each 3D path. I wonder if there is any way to export Keyframe of 3D paths to excel file and import excel file to update keyframe of 3D paths. Thanks
Quan Son Nguyen over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Allow users to see full calendar names in Task Properties> General

Currently if users have calendars with long names, they can be cut off in Task Properties> General> general> calendar picker. This discourages users from using Pro as a plannning/ scheduling tool. Provide a way to see full calendar names,...
Dimitrios Mitritsios almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Planned

Unnecessary information exported with MicroStation plugin

while exporting spx from MicroStation, the plugin exports 'Workset' header and other shared cell definitions which not required... it will be good not to export them as there is no use of them for building 4D.
Ohsung Kwan almost 4 years ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 1 Will not implement

Keyframe List Import / Export

It would be really useful to add a feature to import and export the 3D Path Keyframe Lists for a project. This would allow the Keyframe List to be manipulated in other software, for example Excel, and imported back into the project.
Ian Bannerman over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Already exists

Resource & 3D User Fields that are created/updated in 4D to be accessible in Control, Modeler & Field

Resource & 3D User Fields that are created/updated in 4D to be accessible in Control, Modeler & Field. This is important because as we package work in 4D, populating these user fields would enhance QTO's in modeler (via queries) and filter...
Doug Theret almost 4 years ago in SYNCHRO 4D Pro 1 Planned

Improved condition for Auto-Matching

Guest almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Finer control over permissions

I need finer controll over permissions. I want users to only edit the comments or user Fields. I think that the administrator needs to be able to controll mutch more than he can today. We are using SWP and find it hard to set the Project up how we...
about 5 years ago in SYNCHRO 4D Pro 0 Already exists