Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 227 of 1167

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail over 1 year ago in SYNCHRO 4D Pro / Animations 0

Import https://dotbim.net/ .bim file format

https://dotbim.net/
David Félix almost 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Changing percent complete according to filtering

Hello, % complete value does not change when we apply the filter in the task list. This is working in Primavera very well. Synchro should provide this for planning reports. During coordination meetings, the project team wants to see the total prog...
Mehmet akif about 2 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

The ability to set the visibility duration of equipment associated to a task.

Example, a mobile crane is assigned to a 'roof cladding' task. The crane will only be required on site for the first 50% of the task to load the panels then it can removed. Having the ability/option to make the crane disappear after a certain amou...
Stephen King about 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts / Animations 0 Will not implement

Users from Synchro Control also visible in Synchro 4D Pro users

In Synchro Control you add users to your project with some the rights to schedule in Synchro Control projects with Synchro 4D Pro. When you work with different people in Synchro 4D Pro you canot see the users from Synchro Control in Synchro 4D Pro...
Martijn Querner about 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

User dependent "3D by selection" 3D Filters

Having individual 3D filters by selection per Control user. If you isolate or hide any 3D data in a Control project Synchro 4D Pro automatically activates the 3D Filter "3D by Selection [Administrator]". We are working simultaneously on Control pr...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Allow 'user' specific configurations for layout and filters in additional to the existing 'global' configuration

Global and user settings for filters and layouts. Filters could be overwritten by other users. Filters being assigned to a "global" permissions or "user only" are keys to our ability to work individually as schedulers and support our project. A gr...
Jason Summers over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Adding Lag values in Task Properties> Links> Predecessors/ Successors do not consistently behave properly

Care must be taken when adding Lag values. This function did not work properly each time. The buttons in the task properties links dialog box were sometimes very touchy and did not function properly. In some cases the correct selection of a button...
Jason Summers over 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 4 Planned

Logic tracing when activities are filtered - See attached video for additional details

The inability to filter activities and trace logic where the next activity would show in your visual is a major issue that affects our reporting of critical paths. Those paths can be coded but should be traced rather than simply relying on a code ...
Jason Summers over 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Planned

Transparency on Resource Codes and Activity Codes

Every now and then need to do workarounds because resource or activity codes can only be shown as solid colours on the 3D view. Would be good if it was possible to allow for them to be transparent.
David Félix over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Future consideration