Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1336

Manage iModel connections UI in Synchro control

I would like the feature to select all imodel and change the sync schedule timing or while changing the schedule for each model the options should stick in one place when scrolling down to select the models.
Jerry David Jaypaul over 3 years ago in SYNCHRO Control 0 Future consideration

Gantt Chart with feature to collapse/expand to a certain WBS Level combined with timeline display

At the moment the timeline is only used as a focus time slider feature. Vizualization of the underlying schedule will be very helpful to a understanding of the work ahead. It would be very nice to have the possibility to have the focus time slider...
Brigt Rykkje about 5 years ago in [Archive] SYNCHRO 4D Review 0 Planned

Save Form Histroy

When user use form for check list. User want to save the check list history. So user can see what is failed on first check list. with the comment and Photo. This is reqested by RWS singapore, and nPulse has this feature.
Indrawan Wijaya over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Allow 'user' specific configurations for layout and filters in additional to the existing 'global' configuration

Global and user settings for filters and layouts. Filters could be overwritten by other users. Filters being assigned to a "global" permissions or "user only" are keys to our ability to work individually as schedulers and support our project. A gr...
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Adding Lag values in Task Properties> Links> Predecessors/ Successors do not consistently behave properly

Care must be taken when adding Lag values. This function did not work properly each time. The buttons in the task properties links dialog box were sometimes very touchy and did not function properly. In some cases the correct selection of a button...
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 4 Planned

Logic tracing when activities are filtered - See attached video for additional details

The inability to filter activities and trace logic where the next activity would show in your visual is a major issue that affects our reporting of critical paths. Those paths can be coded but should be traced rather than simply relying on a code ...
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Planned

Dockets: allow users to have the ability to approve in bulk.

Although the Docket Inbox allows a user to approve multiple Dockets, it is limited to a single day and still requires the user to select dockets individually.
Luke Read almost 2 years ago in EVM (Perform) / Dockets 0 Future Consideration

Transparency on Resource Codes and Activity Codes

Every now and then need to do workarounds because resource or activity codes can only be shown as solid colours on the 3D view. Would be good if it was possible to allow for them to be transparent.
David Félix over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Future consideration

Import/Export Keyframe of 3D Path

Hello Team, I know that we can copy/pas keyframe as text . This function requires to realize for each 3D path. I wonder if there is any way to export Keyframe of 3D paths to excel file and import excel file to update keyframe of 3D paths. Thanks
Quan Son Nguyen almost 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Use of wild cards within Script

Hi, Would it be possible to implement wild cards within SYNCHRO Script? Example: I have the following User Fields: ABCD, ABED, ABBN, ABLM, ABHJ, ABDH, etc. I would like to sum all their values with something like SUM UFV("*AB*"). This would be ver...
Alexandru Buzan over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 3 Future consideration