ADD A NEW IDEA

Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 227

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla about 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

The ability to set the visibility duration of equipment associated to a task.

Example, a mobile crane is assigned to a 'roof cladding' task. The crane will only be required on site for the first 50% of the task to load the panels then it can removed. Having the ability/option to make the crane disappear after a certain amou...
Stephen King about 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts / Animations 0 Will not implement

Users from Synchro Control also visible in Synchro 4D Pro users

In Synchro Control you add users to your project with some the rights to schedule in Synchro Control projects with Synchro 4D Pro. When you work with different people in Synchro 4D Pro you canot see the users from Synchro Control in Synchro 4D Pro...
Martijn Querner about 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Assemblies

Hi, In Revit, some elements are modelling as linked assemblies for example walls. There are actually some layers for walls and each layer is a material with its own properties like cost or thickness etc. when they are modelled in Revit. However, w...
Taha Erenoğlu about 2 years ago in SYNCHRO 4D Pro / Integrations 3 Future consideration

3D Notation ( to hold the planned date)

How to add the planned cast date to the notation into the 3D snapshot view ? or is there any way to extract the date in grant chart to the 3D model
chan kp about 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

User dependent "3D by selection" 3D Filters

Having individual 3D filters by selection per Control user. If you isolate or hide any 3D data in a Control project Synchro 4D Pro automatically activates the 3D Filter "3D by Selection [Administrator]". We are working simultaneously on Control pr...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Display resource mapping in 3d view

Would it be possible to see the human resources allocation by color in the 3d view and be able to see where the human resource overallocation by area and also be able to use this to heat map red orange or green status for high levels of resources
Gerard Doheny over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Already exists

Include Critical Path Test in the Schedule Health Check

The Schedule Heath Check report mentions the Critical Path Test as item 12. However the report does not perform the check automatically, instead the user should perform the test manually. With this addition the full DCMA-14 test can be performed w...
Michiel Janssens over 2 years ago in SYNCHRO 4D Pro / Printing/Reports 0 Will not implement

Update Resources based on updated 3D model

If new elements are added in 3D model for which resources have been created in Synchro 4D pro. There must be option to recreate the existing resources without breaking the links and maintaining the hierarchy as per the 3D model.
Jerry David Jaypaul over 2 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Planned

Import Non labor data from Primavera P6 to Synchro

Currently I am not able to import non labor data to synchro. If we could import non labor data and apply global changes in the synchro itself it would be beneficial.
Ameya Talekar over 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement