Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1337

See source of model and Ability to remove model from iModel viewer

Using the iModel viewer in the browser gives a list of different models. It doesn't show however where these models come from. It would be useful to see that (when hovering or in the properties ...) At the same time it would be useful to have the ...
Johan De Cock over 1 year ago in SYNCHRO Control / Models 0 Future consideration

Get overview of "local" connectors from within the cloud environment

I sometimes use the iTwin Synchroniser from my desktop to directly synchronize models from a local source to the iModel. This means I don't have to first upload them, makes it also easier to deal with versioning. Unfortunately outside of the local...
Johan De Cock over 1 year ago in SYNCHRO Control / Models 0

Allow GCS Reprojection

I often have models or drawings that are not created in the same (/correct) local coordinate system. In Microstation application it is possible to assign GCS to those different files and then reference them with "GCS reprojection". Meaning that th...
Johan De Cock over 1 year ago in SYNCHRO Control / Models 0 Planned

Allow user to specify key used for mapping

When we import Excel File to SYNCHRO, It is good it can accept other data as the Mapping Key, not only the SYNCHRO Standard ID. Please check the PDF file attached in more details.
Indrawan Gmail almost 3 years ago in SYNCHRO 4D Pro / Import/Export 4 Planned

Option to Link Tagged Items to Revised/Current Qty/Hrs

Hi, would be great to have a tick box where I can select to make the activity's revised/current qty/hours, align automatically to whatever the tagged item list contains. When I import, it assigns to the Tagged item register and items values automa...
David Viola almost 3 years ago in EVM (Perform) / Progress Measurement 0 Future Consideration

Showing and hiding the button in the SYNCHRO Control Portal

The ability to show and hide the buttons on the left hand side of the portal. We are using SYNCHRO Control to involve stakeholders without having to install the SYNCHRO Open Viewer. We are not using documents, forms, inspections or dashboards in t...
Stephan Klotz over 4 years ago in SYNCHRO Control / Admin 0 Future consideration

Restrict creation of Events to authorised personnel

Restricted to minimise the number of events and control the relevance of events. Site teams to submit justified requests to PMs/PEs for creation of events.
Ryan Berkhout almost 3 years ago in EVM (Perform) / Events & Notices 1 Will not implement

Finer control over permissions

I need finer controll over permissions. I want users to only edit the comments or user Fields. I think that the administrator needs to be able to controll mutch more than he can today. We are using SWP and find it hard to set the Project up how we...
almost 6 years ago in SYNCHRO 4D Pro 0 Already exists

We are going to begin working with the Dashboard in SYNCHRO more and i came across some issues that would be an annoyance to our customers.

We are going to begin working with the Dashboard in SYNCHRO more and i came across some issues that would be an annoyance to our customers. Please see the attached document.
David Dudek over 1 year ago in SYNCHRO Control 1 Planned

Data Date line for Late tasks should not extend to start of task

One issue which I discussed with our managers yesterday was the lack of ability to illustrate accurately a jagged line. See below snap shot of the progress line with the late tasks switched on. As can be seen even when partial progress is show (in...
almost 6 years ago in SYNCHRO 4D Pro 0 Planned