It is useful because each time after importing revised or updated schedule with varied timeframe, we have to set camera which is very time taking and repeating. So, if we can avoid it by anchoring the camera with task it would much easier and time...
Include GUIDs in cost code assignment summary export
Currently after user completes the cost code assignments in Modeler, the export/ summary does not necessary provide the GUIDs for the elements, therefore consultants or services colleagues don't have a way to bring cost codes to 4D Pro unless Mode...
Jacqueline Chen
about 4 years ago
in SYNCHRO Modeler
0
Planned
When a user creates a form in 'My work', he wants to create it based on the Task Name of 4D Pro, like Perform. He said that it can be used to input the quantity value for each task in the field.
Provide ability to set default location in map for Desktop users - Project Pin
When using the location functionality we have two options: Set location of a form or navigate to my location to see all submitted forms. In any case, when using the Desktop Control client, Map most likely defaults to US. We are in UK. When I click...
A New Task Filter Allowing You To Filter Based On Assigned Resources
We require this feature because we need a quick way of filtering tasks without/with any resources assigned after doing a programme synchronisation. Currently the only way to do this is by filtering the resources manually, however, when you import ...
Possible to allow users to stop the synchronising process? Currently, users not able to stop the process once it is started, and not able to skip to the next model that is in the queue. Is there a way to skip the synchronizing process to the next ...
Guest
about 4 years ago
in SYNCHRO 4D Pro
2
Future consideration
Ability to calculate slice lengths for slices made through Work Area from graphic tool
Currently, the Slice Lengths are only calculated for slices made through Quantity Take-Off View > Slice tools. The slices made through Area Break Down View > Work Area from the Graphic tool do not compute the lengths.
Arpit Prakash
about 2 years ago
in SYNCHRO Modeler
0
Needs review
provide capability for user selectable date/time binding to have same functionality as DueDate
As a user i would like to have the ability to track more than one date in a form. My need at the moment is where I have a calibration register. Each form is a record for an instrument. The instrument has a calibration expiry (used DueDate) as well...
To have performance percentage complete in Synchro
By default the performance percentage complete is built-in in P6, having performance percentage complete in synchro can directly display the percentage of earned value cost / budgeted total cost in a project.