Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1287

Able to Export/Import Keyboard Shortcuts

Shortcut are key for 4D navigation/production. So far this settings are lost every time, that software doesn't close properly, it's a lot of time consuming to reset it all the time. Could it be add, an option for Export/Import our own Keyboard S...
Cyrille Laurent about 1 month ago in SYNCHRO 4D Pro 0

Supply Chain Implementation

Add in the full bidding cycle into Synchro, add in the following: Pre-Bid - Bid invitations, Invitations to Bid, Custom Bid Forms(Cost and Schedule), Add Deliverables Management or ProjectWise direct connection for drawings/spec upload Bidding - S...
Guest about 2 years ago in Contracts 2 Planned

Dynamic expressions for Form's controls

hi can we add dynamic expression into Form's action/scripts? please refer to the attachment that the Project Name is added to the action/scripts as a dynamic expression. whenever the Project Name changes, the value of that Control updates automati...
Shaohua Guan 2 months ago in SYNCHRO Control / Forms 1

Ability to make Form field required using scripts

This is useful for cases where we want to make a field hidden by default, but it becomes visible and required based upon other related input. We can make fields required through workflow, but that is not available through initialization settings.
Arpit Prakash 5 months ago in SYNCHRO Control / Forms 0

HIde all Parent Objects with one click

All sliced geometry that is linked in 4D pro still has parent objects shown in Control Viewer. The ability to hide them all with one click would be very useful
Joe Griffiths 2 months ago in SYNCHRO Control / Model Viewer 0

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest about 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Ability to view and add station offset information while creating Forms in field

Similar to how this app does it - https://www.onstationapp.com/ While in the iModel view, we should be able to - Jump to our GPS location, Start a Form Click on the pin to pop up the station information Copy that into a Form - auto or manual
Arpit Prakash about 1 month ago in Field 0

Add "Limit to fields on the form" to the

Bentley includes a "Limit to fields on the form" function in the Actions-Scripts function at the Design Form stage (whoever added this is a genius!). Please include the same "Limit to fields/bindings on the form" function on the Field Options part...
Guest about 1 month ago in SYNCHRO Control / Forms 0 Likely to implement

Add inspections Group column in Forms Manager > Inspections

This will help easily identify which group a Form belongs to, instead of going to a separate tab.
Arpit Prakash 4 months ago in SYNCHRO Control / Inspection 0

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas over 1 year ago in SYNCHRO Control / Models 7 Future consideration