Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1325

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas about 2 years ago in SYNCHRO Control / Models 7 Future consideration

Make it available to Download and Print Multiple Plan Set Pages at once by putting a box next to the page and checking off the Page wanting to Print.

Make it available to Download and Print Multiple Plan Set Pages at once by putting a box next to the page and checking off the Page wanting to Print and download. Right now there is now way to Download multiple Plan sheets at once. See Attached Sc...
David Dudek 4 months ago in SYNCHRO Control / Plan Sets 0 Likely to implement

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...
Guest about 4 years ago in SYNCHRO Control / Admin 0 Future consideration

Civil Design Validation and Analysis: Enable read-only view of Superelevation Analysis Result

As a user, I want to view Superelevation Analysis Results in SYNCHRO Field.
Luke Read 3 months ago in Field / Models | Tools 0 Future Consideration

Civil Frontstage: Civil Tools - Enable Drainage Info and Drainage Profile in SYNCHRO Field

As a user, I want to be able to use the Drainage Info and Drainage Profile civil tools in SYNCHRO Field, same as what is available in the Bentley Infrastructure Cloud portal.
Luke Read 3 months ago in Field / Models | Tools 0 Future Consideration

Delete individual slices instead of merging whole element

When using Synchro Modeler, you can create various slices to subdivide an element. It is not possible to delete just one slice, instead you can only merge the element so that all of the slices are deleted. This is a big problem if many slices have...
Ruth Fuller almost 2 years ago in SYNCHRO Modeler 2 Needs review

Add Work Area tag to elements automatically after creating Work Areas

No description provided
Johannes Yu 6 months ago in SYNCHRO Modeler 0 Needs review

Email notifications showing mis-leading information

Ability to change the basic email notification sent out. Currently the email notification includes info like Created by and Created on, which COUNTERINTUITIVELY tells the user who has DESIGNED this form and WHEN IT WAS DESINGED.. instead of showin...
Irena Seleznjova 5 months ago in SYNCHRO Control / Forms 0

Ability to bulk create Actions/Scripts through Excel Configuration Spreadsheet

No description provided
Arpit Prakash 11 months ago in SYNCHRO Control / Forms / Inspection 0 Planned

Allow documents connections to different sources

Having a connection to ProjectWise is good, but consulting organizations use multiple document systems. To simplify workflows for consulting organizations with multiple documents sources working with owner/operators, contractors, other consultants...
Kerry Newbanks 5 months ago in SYNCHRO Control / Documents 0 Future consideration