View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1303

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

How to format text eg. Underline and bold heading in daily report section 7?

No description provided
Brendan Pilmore 7 months ago in Perform 1

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas about 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Future consideration

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest over 3 years ago in SYNCHRO Control / Inspection 0 Planned

Could additional snap modes be added in Field model tools

Could you add Intersection, Center, and Midpoint Snaps to SYNCHRO Field model viewing?
Dan Sheldon almost 2 years ago in Field / Models | Tools 3 Future Consideration

Showing all active Resources for a look ahead period

I am trying to generate look ahead prints with all active 3D resources visible for that look ahead period instead of just the active Resources of the Focus Time. Example: show all tasks in between 25th of July '22 and 21st of August '22.I would li...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 1 Already exists

Synchro 4D Pro Gantt and EVM configuration improvement

As per Arpit's response, none of the features required below are possible in Synchro, it would be a meaningful improvement if Synchro aspires to be a tool to be used for construction/planning management rather than only 4D: Hi, I'm trying to do so...
Rafael Vendrame 7 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Keep colors assigned in validation feature for query assignment of cost codes.

Need to have the capability to assign colors to cost codes assignments in Quantity Takeoff view and toggle back and forth from red/green/gray view. It is difficult to determine if query selected elements are listed in the correct property provided...
David Gallaher almost 2 years ago in SYNCHRO Modeler 0 Needs review

Default QR Code Location

Have the capability to setup the default location for the QR code stamp in plan set module. Also have the capability to stamp all Plan sets at one time or selected range, draft or published status, etc.
David Gallaher almost 2 years ago in SYNCHRO Control / Plan Sets 2 Future consideration