Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1309

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas about 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Future consideration

View Control on multiple Monitors to improve workflows and clarity

Similar to how designers and split their desktop products onto multiple monitors, can we have this same functionality within Bentley web-based products. An example would be, I would prefer to see the Schedule Gantt Chart and details in one window,...
Corey Johnson over 2 years ago in SYNCHRO Control / Documents / Forms / Maps / Models 1 Future consideration

Ability to save Civil Tools Views

Users want to be able to save profile/cross-section views, with any visible measured dimensions. We should be able to save it to local drive/documents/included in saved views. The use case is to share the information and also attach to Forms. Curr...
Arpit Prakash almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

Allow Date check for past event

In many occasions we use date for something that is yet to happen. Yet the user can input a date in the past. Having the ability to restrict the date for future events as related to the date of input of information would avoid this kind of errors.
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Showing all active Resources for a look ahead period

I am trying to generate look ahead prints with all active 3D resources visible for that look ahead period instead of just the active Resources of the Focus Time. Example: show all tasks in between 25th of July '22 and 21st of August '22.I would li...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 1 Already exists

Create a Form within a Form

Forms Manager being able to create a Form within a Form. For example; offering the functionality to directly create a punchlist from an Inspection if there's a deviation / breakage / nonconformance; the user can create a Punchlist without having t...
Guest almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Add current progress % next to progress bar for each activity in "All Activities" page

This is an idea from our programming team, which they find it very useful if can directly know the progress of each activity, with the aid of filtering function and WBS, instead of going to another page like "Quantity Progress", which doesn't have...
Tat Man Leung 8 months ago in Perform / Program/Schedule Collaboration 0

Expand on visibility assignments for roles and users

Quite often (almost every multi contractor form) requires visibility to be restricted to Client and anyone in the Creator's organisation. We currently manage this by asking the user to assign a role set up for their company to the AssignedUsers pr...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 1 Future consideration