Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1297

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers almost 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas almost 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 1 Future consideration

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest over 3 years ago in SYNCHRO Control / Inspection 0 Planned

growth simulation to follow 3D path (or polyline)

eg. centerline of pipe, building facade, or curved road
Kate Hester over 7 years ago in SYNCHRO 4D Pro 0 Future consideration

Expand workflows to support automated assignment to previous users

We find the need to expand the built in user controls like Previous action/status user that will allow simple automation to return the flow to the originator in multistep flows.
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Incorporation of an "Undo" feature within the measurement tool

incorporate an "undo" button while you are using any of the civil tools. For example, being able to use the "station/Offset" tool 10 times and only "undoing" the last 3 measurements taken instead of all the 10.
Tony Bonacorsi about 1 year ago in Field / Models | Tools 1 Future Consideration

Enabling measurement tools to convert between different units of measure

have the ability to convert an area measured from Square Feet to Square Yards or Acres automatically with a click of a button like Google Earth's Capability.
Tony Bonacorsi about 1 year ago in Field / Models | Tools 1 Future Consideration

Show any form I want in PDF Mark Up

As a user, I want to be able to determine which forms are available in the PDF mark up tool. Currently, only RFI and Issue forms are available, and sometimes some custom made forms become available - with no indication of the criteria. I imagine a...
Mariano Colicchio 7 months ago in SYNCHRO Control / PDF Markup 0 Likely to implement

Ability to save Civil Tools Views

Users want to be able to save profile/cross-section views, with any visible measured dimensions. We should be able to save it to local drive/documents/included in saved views. The use case is to share the information and also attach to Forms. Curr...
Arpit Prakash over 3 years ago in SYNCHRO Control / Models 0 Future consideration