PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1313

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest almost 4 years ago in SYNCHRO Control / Inspection 0 Planned

Webcam support to monitoring on-site progress

A live webcam connection would be helpful for a better progressing monitoring, especially if it can rotate the same view with the BIM.
Liang Gao over 1 year ago in SYNCHRO Control / Model Viewer 0 Future consideration

Have Total feature for the Data Grid

In the table we can have the Total Line that can give Total number, count, etc (common functions)
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Script Action reporting / Summary and Workflow reporting / Summary

Produce report that user can read and understand (with all workflow and action script configuration) One report for each, Script Action and Workflow.
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Permissions based on workflow transition

It should be possible to define permissions for transition based on roles rather than only be form definition wide permissions (view, create, edit, etc.) This is because it is highly likely that some roles, such as sub-contractors, should be able ...
Arnar Agustsson over 1 year ago in SYNCHRO Control / Forms 0 Planned

Block users from removing users/roles in multi-assign

When the IsPrivate binding is enabled, only users and roles listed in the Assigned To and Assigned Users (multi-assign) can access the form instance. We would like to stop non-admin users from being able to remove roles or users that are already o...
Arnar Agustsson over 1 year ago in SYNCHRO Control / Forms 1 Future consideration

Add User field Drop down list feature

Further to our Customer suggestion, it would be very usful to have a Drop down list feature for User defined Field. It could be the list with the values to be selected from the same formula in the field value, or (to save ASCII script text) is ref...
Pavel Khrapkin over 2 years ago in SYNCHRO 4D Pro 0

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas about 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Future consideration