Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1304

Ability to Filter by Float Path

Its important to be able to back track logic and the drivers in a particular string or path. In other scheduling software, I do this by filtering or grouping by Float Paths. This allows the team to analyze driving activities quickly. Furthermore w...
Kristina Henkai about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Planned

Undo Button or Action in SYNCHRO Modeler

Need an undo button to remove previous actions similar to ORD. This will also help prevent starting over after hiding elements.
Dee User List Acosta about 2 years ago in SYNCHRO Modeler 0 Needs review

Add current progress % next to progress bar for each activity in "All Activities" page

This is an idea from our programming team, which they find it very useful if can directly know the progress of each activity, with the aid of filtering function and WBS, instead of going to another page like "Quantity Progress", which doesn't have...
Tat Man Leung 7 months ago in Perform / Program/Schedule Collaboration 0

Add Legend to Synchro Control Schedule-enabled saved views

Add a legend similar to 4D Pro that shows the appearance profiles in schedule-enabled iModel saved views.
Sarah Ruckhaus 7 months ago in SYNCHRO Control 0

Ability to jump between 2D Sheets and 3D Model Views seamlessly

Currently, we can switch from 2D sheets to the previously opened 3D View in SYNCHRO Control, using the following back button - Need something similar for Field as well.
Arpit Prakash over 1 year ago in Field / Models 1 Future Consideration

Audit Trail in Modeler

When errors are made in cost code assignments it is cumbersome to go back a review the entire model. Having an audit trail feature will pinpoint all actions made, when they were made and by whom to expedite remedying issues. It also will assist in...
David Gallaher over 1 year ago in SYNCHRO Modeler 0 Future consideration

Wrap Text for Activity Name

We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
Sagar Soni almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Ability to flag daily or weekly Templated Report(s) as "Favourites"

If you have a long list of Templated Reports on a project, with not all of them being applicable to a user, it would be good for a user to flag their "Favourite" reports and have them appear at the top of the list
Luke Read over 2 years ago in Perform / Reports 0 Future Consideration

Allow save of a form with incomplete data in mandatory fields in a status

When form bindings are set as required in "status" window the published form will not allow intermediate save until ALL properties have values. Allow for incomplete data to be saved by user. From user perspective I have contributed time to populat...
Kiril Tasev 7 months ago in SYNCHRO Control 0

Add more data type to cascading list

Cascading list currently supports only text data type. More data types (number, boolean, dates) should be added so that the cascading list can interact more with Actions.
Shaohua Guan about 1 year ago in SYNCHRO Control / Forms 0 Future consideration