Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1332

Autodesk BIM360 Integration with iModel

Allow for integration/sync with Autodesk BIM360 sync with iModel, not just ProjectWise.
Connor Smith almost 4 years ago in SYNCHRO Control 0 Future consideration

3D Notations (Footnote / Comment) - Modifying the input (based on property)

We are looking for a solution for creating a footnote / comment automatically based on a property. Normally, the function footnote / comment will give area, length or coordinates automatically but I want the footnote / comment to grab the Typemark...
Guest almost 4 years ago in SYNCHRO 4D Pro / Animations 0 Future consideration

Filter tasks using Activity Codes

Filter Schedule by Activity Code
Joe Griffiths 8 months ago in SYNCHRO Control / Schedule 1

Project filtering by filters or activity codes

the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
Joost Wijnen about 4 years ago in Field / Models | Display 0 Future Consideration

Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph

Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...
Sourav Kumar 8 months ago in SYNCHRO 4D Pro / Animations 0

Assign by Query

When we create the Json File for the Query. If there is any group that do not contains components, the query does not run. We need to delete those groups. It is good if the assignment still run like normal, only ignore the empty group. Please see ...
Indrawan Gmail over 2 years ago in SYNCHRO Modeler 0 Needs review

Ability to jump between 2D Sheets and 3D Model Views seamlessly

Currently, we can switch from 2D sheets to the previously opened 3D View in SYNCHRO Control, using the following back button - Need something similar for Field as well.
Arpit Prakash about 2 years ago in Field / Models 1 Future Consideration

Audit Trail in Modeler

When errors are made in cost code assignments it is cumbersome to go back a review the entire model. Having an audit trail feature will pinpoint all actions made, when they were made and by whom to expedite remedying issues. It also will assist in...
David Gallaher about 2 years ago in SYNCHRO Modeler 0 Future consideration

Integrate Rules of Credit into mobile app (properly)

Currently the rules of credit progress update interface is an 'iwindow'(?) which completely crashes when opened in the windows app.It is currently only available as an add-on you need to request. It is already a tabbed viewer, it doesnt make any s...
Rick Winsor 8 months ago in Perform / SYNCHRO Perform Mobile 0 Future Consideration

Roll up progress/costs to WBS parents

Currently there is no relation between tasks and their subtask, even in rules of credit, you could have all subtasks at 100% but the parent still sits at 0% as a manual input.
Rick Winsor 8 months ago in Perform / Progress Measurement 0 Future Consideration