Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1316

Cancel Button not intuitive

On SYNCHRO Control, when you have a form open and you want to close it, you have to click "cancel" to exit the form. This is not intuitive, because it looks you are canceling the form (in other words, it looks you are erasing all the information)....
Miguel Meninas 7 months ago in SYNCHRO Control / Forms 0

Option to Delete Multiple Attachments from a Form

It would be helpful to have the option of Deleting Multiple Attachments from a Form filled out rather than one at a time. There are times we have a lot of attachments on a form we escalated and need to delete all the attached documents from the form.
David Dudek Jr. over 2 years ago in SYNCHRO Control 0 Planned

Connection between the form document number and Synchro ID column

Having the form document number and Synchro ID column the same is beneficial to each project member as they do not need to open each file to check on what they are looking for. They can straightaway see it from the ID column listed. During form c...
Kimberly Nazareth Angeles over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to Filter by Float Path

Its important to be able to back track logic and the drivers in a particular string or path. In other scheduling software, I do this by filtering or grouping by Float Paths. This allows the team to analyze driving activities quickly. Furthermore w...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Planned

Wrap Text for Activity Name

We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
Sagar Soni almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Add basic ability to markup uploaded images/photos

It would be useful to be able to: Take image with your mobile have ability to add notes, text have ability to add simple markup e.g. line, circle, rectangle been able to choose the colour of the shapes, font Case scenario: Reinforcement cage is de...
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

ISO 19650 Compliance

It appears that your are not able to use ISO 19650 compliant numbering and that your numbering style still following a very basic 30 year out style of numbering. Please re-code and rectify this asap.
Keith Anthon over 2 years ago in SYNCHRO Control / Forms / Plan Sets 0 Future consideration

Add a Control for just Time

Currently, we have a control for Date/Time, a separate for Date, but not for Time.
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Read clash sets from json/csv

Having the ability to export the clash sets to a file (json or csv) and import it would be extremely useful in projects that use the same workspace and tend to have the same categories. Usually, the sets are populated by certain categories. The fi...
Rafael Ramirez Vizuete 7 months ago in SYNCHRO Control / Clash Detection 0

Adding Tag

When adding tag, we do not seems to have a list of existing tags. Request is to list all the existing tags as we enter a string. Also be able to have a hierarchy tag If we could introduce TAG IA so by doing OCR, tags could be propose and accept by...
Luc Poulin 7 months ago in SYNCHRO Control / Documents 0