PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1335

Form interface in 4D should upto date with Form capability

Not all Form Capability is shown in the 4D. Example. The Default Value are not showing in 4D when we create a new form. Regards, Indrawan
Indrawan Wijaya about 1 month ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0

Enhancement and Customisability of SYNCHRO Notifications

This idea has two parts to it: 1) Enhancement After using SYNCHRO and deploying it for many projects, we realise the pressing need for the following to be available: Notification once a form is overdue Notification to apply to eveyone in the CC li...
Guest almost 4 years ago in SYNCHRO Control / Forms 3 Future consideration

Ability to copy Form Workflow from other existing Forms types


Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0 Planned

Automated Field Matching for PDF Printouts

The goal is to enhance Synchro Control's printout configuration by enabling the tool to automatically recognize and match fields configured in a PDF with the corresponding bindings in the form. This feature aims to significantly reduce the manual ...
Yessica Andrade Barbosa 7 months ago in SYNCHRO Control / Forms 0

Screen capture integration

Provide an integration with the screen capture capability of a mobile device to save captures to Field Documents folder or connected PW folder. Current workflow of user takes a screen capture then must go into device gallery and manually move scre...
Kerry Newbanks 10 months ago in Field / Documents | Connections 0

Ability to push Form/Inspection definition updates from a template project to production projects

Currently, we have to go to each production project and reprovision them to get the latest updates from the template. It would be ideal to push the updates directly from the template project to all production projects, selected through a list.
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 1 Planned

Supply Chain Implementation

Add in the full bidding cycle into Synchro, add in the following: Pre-Bid - Bid invitations, Invitations to Bid, Custom Bid Forms(Cost and Schedule), Add Deliverables Management or ProjectWise direct connection for drawings/spec upload Bidding - S...
Guest over 2 years ago in Contracts 2 Planned

Add a Data Center in Latin America

For South American countries, the closest Data Center is East US. The incorporation of a Data Center for this region is urgently needed (Azure has a Data Center in Brazil, right?), since the collaborative work based on the SYNCHRO Control cloud pr...
Jean Delgadillo almost 2 years ago in SYNCHRO Control / Admin 1

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...