Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1323

User History in Resources Status from SYNCHRO Field

When working with SYNCHRO Field, multiple users can update Resources Statuses from the field. Subsequently, all updates that these users make are visible in the Resources Properties > Status > History window of SYNCHRO 4D Pro. However, only ...
Jean Delgadillo over 1 year ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Ability to bulk upload Actions/Scripts through Excel

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas about 2 years ago in SYNCHRO Control / Models 7 Future consideration

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...
Guest about 4 years ago in SYNCHRO Control / Admin 0 Future consideration

3D grid from design in Synchro

In the design models, grids are always used. For the geographical indication. It would be nice to take over these axes in a similar way from the design software in Synchro. Not as a 3D object. But as a grid where the numbers or figures are easy to...
Martijn Querner about 1 month ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Delete individual slices instead of merging whole element

When using Synchro Modeler, you can create various slices to subdivide an element. It is not possible to delete just one slice, instead you can only merge the element so that all of the slices are deleted. This is a big problem if many slices have...
Ruth Fuller about 2 years ago in SYNCHRO Modeler 2 Needs review

Show multiple dates options in SYNCHRO Control

Currently SYNCHRO Control only shows planned dates, User requirement is to select all sets of dates like best dates.
Manoj Jamma 3 months ago in SYNCHRO Control / Schedule 0

Ability to maintain folder mapping for PDF export through Forms Workflow

If a PDF is set to auto-export at a specific folder location within Documents, using Forms > Workflow > Transition, that path is not maintained through provisioning to a production project.
Arpit Prakash 9 months ago in SYNCHRO Control 0

Ability to Attach Existing Issues to PDF Annotations

One key improvement for the Bentley portal would be the ability to attach an existing issue to a PDF annotation. Currently, this functionality is available in Infrastructure Cloud, but it is not supported in Synchro Field. Enabling users to link e...
Yessica Andrade Barbosa about 2 months ago in Field / Forms | Forms 0

Add the schedule visualization to users with Guest role

For Guest users who visualize the animation the capability of seeing the running schedule would make easier the understanding of what is developing on screen
Francisco Luque Rodríguez about 2 months ago in SYNCHRO Control / Schedule 0