PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1336

Automatically create resource for sliced object in Synchro modeler

Currently, if an element is sliced in Synchro Modeler, its sub-part is not associated with a 3D resource in Synchro 4D, even though the parent element has been associated with a 3D resource. To link these split elements to tasks, we have to manual...
Khai Nam Hoang about 1 month ago in SYNCHRO Modeler / Slice 0 Needs review

Make SYNCHRO field integrate with Office 365 mobile

While our users are using the Field App it would be helpful to be able to Synch it with the Office 365 Mobile
David Dudek 11 months ago in Field / Documents 0

Ability to copy Form Workflow from other existing Forms types


Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0 Planned

Enhancement and Customisability of SYNCHRO Notifications

This idea has two parts to it: 1) Enhancement After using SYNCHRO and deploying it for many projects, we realise the pressing need for the following to be available: Notification once a form is overdue Notification to apply to eveyone in the CC li...
Guest over 3 years ago in SYNCHRO Control / Forms 3 Future consideration

Automated Field Matching for PDF Printouts

The goal is to enhance Synchro Control's printout configuration by enabling the tool to automatically recognize and match fields configured in a PDF with the corresponding bindings in the form. This feature aims to significantly reduce the manual ...
Yessica Andrade Barbosa 7 months ago in SYNCHRO Control / Forms 0

Screen capture integration

Provide an integration with the screen capture capability of a mobile device to save captures to Field Documents folder or connected PW folder. Current workflow of user takes a screen capture then must go into device gallery and manually move scre...
Kerry Newbanks 9 months ago in Field / Documents | Connections 0

Model location sets map location

When creating forms in the model view it would be good to have the pin in the model view added to the same location in the map view. This will reduce the number of entries a user has to make when creating a form, so the user does not have to have ...
Kerry Newbanks 9 months ago in Field / Forms | Forms 0 Future Consideration

Ability to push Form/Inspection definition updates from a template project to production projects

Currently, we have to go to each production project and reprovision them to get the latest updates from the template. It would be ideal to push the updates directly from the template project to all production projects, selected through a list.
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 1 Planned

Supply Chain Implementation

Add in the full bidding cycle into Synchro, add in the following: Pre-Bid - Bid invitations, Invitations to Bid, Custom Bid Forms(Cost and Schedule), Add Deliverables Management or ProjectWise direct connection for drawings/spec upload Bidding - S...
Guest over 2 years ago in Contracts 2 Planned

Improve cost codes (from Modeler) in 4D Pro

Cost Codes in 4D Pro The cost code information comes in the following format, which is not usable at all. How do I aggregate the quantities at Task level? One suggestion could be to have the following setup - User Field Value Cost Code 1 23560.1 C...
Arpit Prakash about 1 month ago in SYNCHRO 4D Pro / Cloud-hosted Control projects / Import/Export 6