Bentley includes a "Limit to fields on the form" function in the Actions-Scripts function at the Design Form stage (whoever added this is a genius!). Please include the same "Limit to fields/bindings on the form" function on the Field Options part...
Navisworks Exporter - Limit User Fields like the Revit Exporter
The .spx exporter in Revit has the ability to limit the number of Userfields exported from Revit. I think it would be a great idea to have the same function built into the Navisworks Exporter. Currently, it exports all Userfields and values and th...
When selecting multiple elements in the model add their quantities together
When selecting multiple elements in the model add there quantities together rather than returning "Varies" If I select two runs of curb and gutter the first being 150ft long and the second being 198ft long I want to get 348ft of curb and gutter in...
For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
We want to be able to run a report which could create an "Audit Trail" by User ID.
In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr.
over 2 years ago
in SYNCHRO Control / Admin
0
Future consideration
provide upload of editable bindings in flow state definition
When we create Form we can now download the form definition. From there it is very easy to create an excel file with the Editable bindings per status. Having option to upload this into the state definition will speed up the development and tweakin...
When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
The cross section tools in Field have limited use, especially to non-designers. Some sort of auto-labeling (ideally of slopes, elevations, material types for meshes, etc.) that could be toggled on and off would be extremely helpful.