Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1322

Add functionality for 3d Connexion Spacemouse

Could capabilities be added for using a 3d Connexion Spacemouse? Currently, I can only zoom in and out - no rotation. It seems this would only require communication with their software development department.
Dennis Parker about 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Within the PDF Plan sets text search

I would like a "google" like search of all the text to locate street names and lot numbers across the PDF set. I would like to search for the matching sheets and when in the sheet see the matching text strings
Bill McNamara over 4 years ago in SYNCHRO Control / Plan Sets 0 Already exists

Add cost codes within modeler tree and have capability to export cost code configuration.

The default format of setting up a cost code configuration to attach to a model is too rigid. It is almost impossible to determine which codes will need to be incorporated for a design build project model. As designers update models more codes wil...
David Gallaher about 2 years ago in SYNCHRO Modeler 0 Future consideration

Ability to filter/select PDF settings plan sheets by user defined tags.

In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
David Gallaher about 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Exported 4D synchro .fbx format when linked with 3ds max file texturing is not possible

Our Team is working on one project and our scope is to export 3D model from synchro as .fbx file and link that file into 3ds max to create rendering according to the planned dates from schedule because we need to update that file multiple times as...
Trishi Ashware about 2 years ago in SYNCHRO 4D Pro / Import/Export 1

Synchronization of tasks from .sp files schedules by Task ID without use of GUID.

In the settings menu there is an option for Primavera P6 to use activity IDs for synchronization. The same option for Synchro .sp files (and other formats) would be very useful as synchronization from external data goes through GUIDs by default. B...
Varvara Kleshchevnikova over 3 years ago in SYNCHRO 4D Pro / Integrations 0 Future consideration

Reality data in Synchro Field app

It would be a great use case if engineers can view the reality data photogrammetry in the Synchro Field app similar to Synchro Control
Janaki Sundaram about 1 year ago in Field / Models | Views 0 Future Consideration

I would like the ability to add additional fields into the Field App View for Forms

I would like the ability to add additional fields into the Field App View for Forms. This option will allow us to be able to sort on a specific field in the field App.
David Dudek over 1 year ago in SYNCHRO Control / Field/Mobile 0

Implementation of a "split screen" feature within the Field app

have a "split screen" capability to see PDF document while keeping the view of the model, similar to what iPad can do.
Tony Bonacorsi over 1 year ago in Field / Models | Visibility 1 Future Consideration

In resource Usage Matrix freeze column up to rate code

Hi currently the resource usage matrix has column frozen until Row Total, can the columns freeze be until Rate Code
Nageshwar Sesetti over 2 years ago in Perform / Timesheets 0 Future Consideration