Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 241

IFC Export

Hi the IFC export is very limitign: Only ifc 2x3 can be exported The PropertySets disappear and the ObjectTypes are not exported in the right way. I kindly ask you, to improve the IFC export as this file format is very popular and regularly used f...
Manuel Kraehenbuehl over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Need updated SYNCHRO 4D Pro plugin for Navisworks 2023

No description provided
Arpit Prakash almost 2 years ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 1 Planned

Export to Synchro plugin for Revit 2024

Export to Synchro plugin for Revit 2024 to be introduced soon as many of our projects is on hold due to this.
Abhijiti joshi over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Planned

Add ability to control the display order of all models including design models and existing reality data.

It would be really helpful if there was a simplistic way to easily control the "Display Order" of the different design models and reality data. For example, if you have a large design excavation model, it will always display below the existing gro...
Aaron McLean 4 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Performance issue with Synchro 4D for big models

I am trying to perform 4D animation for 530MB nwd file and having lot of problems while navigating model in Synchro 4D. Synchro 4D always shows its on low memory. My machine has good configuration but till having this issue.
Hemant Suryavanshi over 1 year ago in SYNCHRO 4D Pro / Animations 1 Will not implement

Simulation with percent complete number base on Focus Time

in Task list in Gantt, ability to show the task plan percent complete simulation base on the Focus Time.
Indrawan Wijaya 4 months ago in SYNCHRO 4D Pro / Animations 1

Primavera P6 v21 compatibility with Bentley Synchro 4D

I am trying to synchronize my Primavera P6 schedule using Synchro 4D Pro, but I am facing an issue. I am using Primavera P6 version 21, which is not supported by Synchro 4D Pro. Synchro 4D Pro only supports Primavera P6 versions 19.2 or lower. I'v...
Ankit Rai 9 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Will not implement

Navisworks Exporter - Limit User Fields like the Revit Exporter

The .spx exporter in Revit has the ability to limit the number of Userfields exported from Revit. I think it would be a great idea to have the same function built into the Navisworks Exporter. Currently, it exports all Userfields and values and th...
Preston Williams 9 months ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 0

NOT to separate 3D objects to cells when exporting to .spx by Plug-in for Micrpstation or importing straght i.dgn/bim to Synchro

It's very unproductive when all compound 3D objects separate to cell after exporting to .spx by Plug-in for Microstation or importing straght i.dgn/bim to Synchro. And any cell doesn't inherit properties (user fields) from compound 3D object It's ...
Дмитрий Павлович Сергеев over 3 years ago in SYNCHRO 4D Pro / Import/Export 2 Future consideration

To select all elements in custom group of 3D objects when click on the group name

Why when I've made a custom group (grouping by User Field) of 3D objects and try to select all elements by clicking on the group name they don't select? I think it have to work, please fix it.
Дмитрий Павлович Сергеев over 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration