Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1358 of 1358

Allow importing multiple resource statuses on the same date.

This is common when Users are importing statuses from another statusing software - they run the import weekly, while there may be multiple status updates against the same resource in the past week, and they don't have the data of when the update w...
Johannes Yu 4 months ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 2

Work area by Alignment should not give 0 as start location station

Work Area by Alignment always starts at zero The tool always gives the start location station as 0, irrespective of the actual alignment property. Schedule/Work Areas are based on station points, so we have to manually do tons of calculations to s...
Arpit Prakash 4 months ago in SYNCHRO Modeler / Work Area 0 Planned

Bulk upload of Data

Can there be a consideration of having design data on an excel sheet and auto populate the template with the data to avoid uploading each location individually. I.e. I had a project with 850 locations with various data required to be assured on ea...
Marc Allan about 2 months ago in SYNCHRO Control / Forms 3

Enhanced Filtering in Synchro Field's "MyWork" Area

This proposal aims to expand the filtering options available in the "MyWork" area of the Synchro Field application. Currently, the limited filtering capabilities make it difficult for users to efficiently locate specific jobs or forms. By implemen...
Yessica Andrade Barbosa 24 days ago in Field / Forms | Forms 0

Add option NOT to see closed issues from IRS/Forms

We previously had the ability NOT to see 'closed' issues from IRS/Forms in the PDF markup tool in Synchro Field (Documents). Now that functionality has disappeared. We need this functionality back because we are depending on it for construction no...
Elizabeth Huang about 2 months ago in Field / Forms | Forms 0

Direct Form Field Editing in Grid View

Current Problem: In our document control project utilizing PW/SYNCHRO, we currently face a significant efficiency bottleneck when editing data. Despite having an Excel-like grid view with filtering capabilities, any modification to a specific form...
Yessica Andrade Barbosa 25 days ago in SYNCHRO Control / Forms 1 Unlikely to implement

Open a PlantSight Project into Synchro 4D Pro similar to Infrastructure cloud project

Please see attached image for details
Rodney Mascarenhas 2 months ago in SYNCHRO 4D Pro / Integrations 0

Default Values Not Appearing in Mobile Forms

No description provided
Yessica Andrade Barbosa 25 days ago in Field 0

Missing Reassign Button in Mobile App

No description provided
Yessica Andrade Barbosa 25 days ago in Field 0

General Search Functionality Missing in Assign Field

Unable to search users by name in Assign field. Current scrolling-only method is inefficient for user selection.
Yessica Andrade Barbosa 25 days ago in Field / Forms | Forms 0