Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 431 of 431

Add a bulk create report function

Background: In our MTR workflow practice, we have some compliance rules for contractor to follow, e.g. in Reports, MTR project team should generate and submit the report for contractor to review. After that, contractor should review the report...
Tat Man Leung 2 months ago in SYNCHRO Perform / Daily Diary & Reports 0

Ability to opt out of Form notification for specific status

Some users being sent notifications based on their role may not want to get notifications for certain statuses of a form workflow. This can apply to all the form instances in a form def. or just to a specific form instance, that may not be relevan...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0 Unlikely to implement

Improving behavior in SYNCHRO Filtering on Work Screen

Current Filtering Behavior in SYNCHRO Work Screen At present, when users attempt to filter on the Work Screen in SYNCHRO, they must manually click back into the white input box (e.g., next to "Closed") for the filter to activate. This behavior is ...
David Dudek 7 months ago in SYNCHRO Control 1 Planned

project ID

Hi, Following the recent update, we noticed that the Project ID is no longer visible in the project details. We would appreciate it if this could be reinstated, as it is important for our work.
Hamid Muhammadi 2 months ago in SYNCHRO Perform 0

Decrease times for changes to role permissions to update

User needs: When user designs and test forms frequent user changes are made. Would like to not have to wait 15 minutes to test the changes.
Kevin Vivien 5 months ago in SYNCHRO Control / Forms 0

Screen capture integration

Provide an integration with the screen capture capability of a mobile device to save captures to Field Documents folder or connected PW folder. Current workflow of user takes a screen capture then must go into device gallery and manually move scre...
Kerry Newbanks over 1 year ago in Mobile / Documents | Connections 0

Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule

Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro. These layouts must include : - Schedule Tasks Group and Sort, - Schedules tasks filters, - Relevant Schedule Tasks Attrib...
Thibault Dumas over 4 years ago in SYNCHRO Control / Models 1 Planned

Ability to bulk upload Actions/Scripts through Excel

No description provided
Arpit Prakash about 2 years ago in SYNCHRO Control / Forms / Inspection 0 Planned

Ability to select and move multiple pages in plan set config

We update plan sets as new sheets are prepared. These may not necessarily fall in sequence after the existing sheets, which is where all drafh sheets land by default. So we have to move 50-100 sheets to their correct location in the set. Currently...
Arpit Prakash 2 months ago in SYNCHRO Control / Plan Sets 0

Civil Design Validation and Analysis: Enable read-only view of Superelevation Analysis Result

As a user, I want to view Superelevation Analysis Results in SYNCHRO Field.
Luke Read about 1 year ago in Mobile / Models | Tools 0 Future Consideration