PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1336 of 1336

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Improve cost codes (from Modeler) in 4D Pro

Cost Codes in 4D Pro The cost code information comes in the following format, which is not usable at all. How do I aggregate the quantities at Task level? One suggestion could be to have the following setup - User Field Value Cost Code 1 23560.1 C...
Arpit Prakash about 1 month ago in SYNCHRO 4D Pro / Cloud-hosted Control projects / Import/Export 6

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...
Guest over 4 years ago in SYNCHRO Control / Admin 0 Future consideration

User History in Resources Status from SYNCHRO Field

When working with SYNCHRO Field, multiple users can update Resources Statuses from the field. Subsequently, all updates that these users make are visible in the Resources Properties > Status > History window of SYNCHRO 4D Pro. However, only ...
Jean Delgadillo almost 2 years ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 7 Future consideration

Ability to bulk upload Actions/Scripts through Excel

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

3D grid from design in Synchro

In the design models, grids are always used. For the geographical indication. It would be nice to take over these axes in a similar way from the design software in Synchro. Not as a 3D object. But as a grid where the numbers or figures are easy to...
Martijn Querner 3 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Delete individual slices instead of merging whole element

When using Synchro Modeler, you can create various slices to subdivide an element. It is not possible to delete just one slice, instead you can only merge the element so that all of the slices are deleted. This is a big problem if many slices have...
Ruth Fuller about 2 years ago in SYNCHRO Modeler 2 Needs review

Display the location of the user on the model

Enable GPS location of user on the model (the "blue dot"), based on the device location service, to allow a user to better orient themselves while on the construction site. UPD.: "As a field engineer, I want the mobile app to display my current lo...
Luke Read 6 months ago in Field / Models | Display 0 Future Consideration

Ability to maintain folder mapping for PDF export through Forms Workflow

If a PDF is set to auto-export at a specific folder location within Documents, using Forms > Workflow > Transition, that path is not maintained through provisioning to a production project.
Arpit Prakash 10 months ago in SYNCHRO Control 0