Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.
Currently in synchro Control \ Schedule the animation is starting at the Project Start Date.
Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control
1
Future consideration
Ability to filter/select PDF settings plan sheets by user defined tags.
In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
Imodel Saved Views - Don't turn on new content by default
Currently, if we add new levels or new references to our source DGN files and then re-sync imodels, those new elements get turned on in every saved view. We don't want this. We want the option to turn on new content but to not have it alter our ex...
It would be great if we can have the search function for documents within SYNCHRO Field. We have a client who is about to upload approx. 100 pdfs per day in Control-documents, pdfs which will be opened by inspectors on site. Imagine someone on sit...
Allow save of a form with incomplete data in mandatory fields in a status
When form bindings are set as required in "status" window the published form will not allow intermediate save until ALL properties have values. Allow for incomplete data to be saved by user. From user perspective I have contributed time to populat...