PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 21

There shall be two way mapping between 3D models and schedules. If we select any activity, the respective 3D model should be highlighted rest of the 3D objects shall be visible with least transparency.

It will be useful to analyse the intrfaces between two different disciplines
Ketan Gupta over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Already exists

Display resource mapping in 3d view

Would it be possible to see the human resources allocation by color in the 3d view and be able to see where the human resource overallocation by area and also be able to use this to heat map red orange or green status for high levels of resources
Gerard Doheny over 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Already exists

Available Units

Does "Available Units" actually do anything? For example, the "Assigned Units" cannot exceed "Available Units".
Shaohua Guan almost 4 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 1 Already exists

Export Excel With the Filter

Hi Support, When we do Export Excel, we hope we can export the data with setting that we apply to the table (example the Filter, Sort etc.) Right now it just export whole table. Thank you, Indrawan
Indrawan Wijaya almost 4 years ago in SYNCHRO 4D Pro / Import/Export / Printing/Reports 1 Already exists

Settings for company

It will be good to have followings to manage multiple contract packages as PM : Import Company List from other Synchro File Add Company Type.
Ohsung Kwan almost 5 years ago in SYNCHRO 4D Pro 0 Already exists

Imagine a ready schedule and the work has been postponed. How to move the entire schedule to a new date?

It happened to me.
Guest almost 5 years ago in SYNCHRO 4D Pro 1 Already exists

Ability to accurately adjust camera angle

I regularly work with team members that are wanting a view at a specific angle. i currently try to get it as close as possible however, they get fussy if it isnt exact. possibly adding to the viewcube a degrees modifier would work.
Guest about 5 years ago in SYNCHRO 4D Pro 1 Already exists

Modify and filter 3D Paths

Make 3D paths creating and modifying easier and cleaner. 1.Create some preset movement for rotations (concrete site boom, tower cranes, cars driving) 2.Also for the modifying 3D paths, is there a way to adjust the position of 3D object and time (l...
Shuo Wang about 5 years ago in SYNCHRO 4D Pro 0 Already exists

Selected objects based on Appearance Profile

This would be another useful way of selecting geometry in groups. Sometimes you've created specific profiles or colours for certain trades or construction types. Being able to select everything in view using a particular profile would be a nice ad...
Guest about 5 years ago in SYNCHRO 4D Pro 0 Already exists

Drag and Drop tasks to reposition them

Re-organizing multiple tasks by using the outdent, indent, move up and move down is slow and cumbersome. It would be a lot easier of we could simply drag them into their new position as can be done in MS Project.
almost 6 years ago in SYNCHRO 4D Pro 0 Already exists