PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1335

Visualize non 3D resources in Control

Hi, Currently we can only graphically visualize the 3D resources assigned to tasks when the task is selected. Our users would like to see also the traditional resources that are assigned to tasks, i.e. human resources. This can be added in Task Pr...
Alexandru Buzan about 2 years ago in SYNCHRO Control / Schedule 0

Allow for deleting multiple Work Areas at once

Manual deletion of 50+ Work Areas is such a pain.
Patryk Makowski over 1 year ago in SYNCHRO Modeler 0 Needs review

Dissociate Plan Set admin setting from Edit project detail setting

Currently, if a Role only has Plan Set admin checked but not Edit Project Detail, they will not see Plan Set options under Admin. Project settings and Plan Set settings are relevant to different personas, so need not be connected.
Arpit Prakash about 1 year ago in SYNCHRO Control / Admin 0

Export to IFC with colours

Currently when we export to IFC all objects are white. Ideally we should be able to export to IFC with the original colours or even colours that the user overwritten.
David Félix over 2 years ago in SYNCHRO 4D Pro / Import/Export 1 Will not implement

Related forms to be bound to a specific location or control in a form.

When we relate forms we usually do that for a specific reason or as a workaround to raise a form from within a form. When related currently the forms are showing bunched up together with no sensible order or context. As a user I want to see the es...
Kiril Tasev about 1 year ago in SYNCHRO Control / Forms 0

Attachments within Transition Button

It would be usefull to have a way to also include attachments, as we do through the normal PDF export (in a folder for attachments), using the transition button in the workflow
Joana Isabel Neves Gomes 6 months ago in SYNCHRO Control / Forms 0 Future consideration

Message or a Tooltip on not being able to upload a file directly from zip

Add a message that files need to be unzipped before it can be uploaded. When selecting a PDF from zip, I am able to drag & drop. I get an error message that the PDF failed to upload. Maybe include a message at the top stating files that are in...
Derryl Acosta about 2 years ago in SYNCHRO Control / Plan Sets 0 Likely to implement

synchronise saved views between synchro imodel and connect design review / itwinhub

it would be great that the saved views created in synchro control imodel could be automatically synchronized over to the other platform / services such as design review and itwin hub
Guest almost 4 years ago in SYNCHRO Control / Models 1 Will not implement

Trailing zeros not showing up on the "Decimal" Numberbox Field

Currently, trailing zeros (trailing zeros are a sequence of 0 in the decimal representation of a number, after which no other digits follow ) do not show up, when using a "decimal " numberbox field . There should be a button (per example) allowing...
Miguel Meninas 10 months ago in SYNCHRO Control / Forms 0

Default to Window Placement #4

As an enterprise, we need the ability to default a window placement for our users. Our teams are used to seeing a similar layout to Window Placement number 4 in other CPM Scheduling Tools. We would like to scale the use of Synchro Scheduler to rep...
Thomas Whiteley over 2 years ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 0