Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1287

Default date and "in report" for log entries

Can we set the web activity log fields to be default "todays date" and "include in reports"=true. as opposed to currently they are blank.
Philip Wheeler 12 months ago in Perform / Daily Diary & Reports 2 Future Consideration

Need to be able to print forms at any stage,

There should be an option to print form at any stage Cancel / Save-Exit should be "Print / Save-Exit / Cancel"
Keith Anthon almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Assemblies

Hi, In Revit, some elements are modelling as linked assemblies for example walls. There are actually some layers for walls and each layer is a material with its own properties like cost or thickness etc. when they are modelled in Revit. However, w...
Taha Erenoğlu over 2 years ago in SYNCHRO 4D Pro / Integrations 3 Future consideration

3D Notation ( to hold the planned date)

How to add the planned cast date to the notation into the 3D snapshot view ? or is there any way to extract the date in grant chart to the 3D model
chan kp almost 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Control Growth speed of appearance profile

Having a Growth speed parameter to the appearance profile. eg- Stepwise, interval wise, Gradual speed
Romit Takle about 3 years ago in SYNCHRO 4D Pro / Animations 0 Future consideration

Drag and Drop tasks to reposition them

Re-organizing multiple tasks by using the outdent, indent, move up and move down is slow and cumbersome. It would be a lot easier of we could simply drag them into their new position as can be done in MS Project.
over 5 years ago in SYNCHRO 4D Pro 0 Already exists

Allow direct input of predecessor/successor tasks by typing in ID's or row numbers in links list

In MS Project, you can very quickly add a bunch of links simply by typing the row ID into the row ID cell in the list of the tasks predecessors or successors. Those fields allow you to type directly into them, and once you have input the ID the cu...
over 5 years ago in SYNCHRO 4D Pro 0 Already exists